Spokane Regional Road Construction Map

16. Broadway Avenue from Fancher Road to
WASHINGTON STATE DEPARTMENT
CITY OF SPOKANE
www.spokanevalley.org
www.spokanecounty.org
www.srtc.org
Or visit our web site at:
Thierman
Road
OF TRANSPORTATION
Or visit our web site at:
Or visit our web site at:
Re-surface Broadway Ave. from Fancher Rd. to
34. Market Street from Garland Avenue to

(509) 343-6370
EASTERN REGION
Thierman Rd. with asphalt concrete pavement.
(509) 688-0171
Francis
Avenue
(509) 477-2547
Spokane, WA 99201
Start: Spring
2009 Complete: Summer 2009
Spokane Valley Pothole Hotline:
Full depth curb-to-curb rehabilitation including curbs
Spokane County Pothole Hotline:
221 W. First Ave., Suite 310
1. US 395-NSC/Freya to Farwell
17. Pines Road/Mansfield Avenue
and sidewalks and installing lighting and trees in
Public Education/Information Coordinator
(509) 921-1000
Construct concrete driving surface for northbound
(509) 477-3600
Reconfigure westbound I-90 ramps at Pines Rd. and
various locations.
Staci Lehman
Spokane Valley, WA 99206
lanes of the North Spokane Corridor. These lanes
Spokane, WA 99260
reconstruct Mansfield Ave. from Wilbur Rd. to Pines Rd.
Start: Summer 2009
Complete: Fall 2009
11707 E. Sprague Ave., Suite 106
will be used for northbound and southbound traffic
1026 W. Broadway Ave.
For more information, please contact:
Started: Summer 2008 Complete: Summer 2009
Public Information Officer
until permanent southbound lanes are built.
Spokane County Public Works Building
35. Alberta Street and Cochran Street from
Spokane County.
Start:
18. Sprague Avenue/Evergreen Road
Carolbelle Branch
Under construction. Complete: Late summer 2009
Engineering and Roads

Northwest Boulevard to Francis Avenue
does this to assure connectivity throughout
Replace asphalt pavement at intersection of Sprague
2. US 395-NSC/BNSF Tunnel
Full depth curb-to-curb rehabilitation of Alberta and
For more information, please contact:
Transportation and small cities and towns. SRTC
Ave. and Evergreen Rd. with concrete pavement.
For more information, please contact:
Build arch tunnel for the BNSF railroad to allow the
Cochran streets from Northwest Blvd. to Francis
County, the Washington State Department of
Start: Spring
2009 Complete: Summer 2009
Ave.
of residential streets.
North Spokane Corridor to pass over the tracks.
each year.
Spokane, City of Spokane Valley, Spokane
Start:
19. Sprague Avenue/McDonald Road
Start: Spring 2009
Complete: Fall 2009
approximately 133 miles of arterials and 290 miles
Under construction. Complete: Late summer 2009
maintains more than 2,500 miles of roadways
transportation departments in the City of
Replace intersection of Sprague Ave. and McDonald
89,000. The City has
road system in the state, and
and collaboration between planning and
3. US 395-NSC/US 2 Lowering
Rd. with concrete pavement.
36. Southeast Boulevard from 29th Avenue to
a population of almost
County has the second largest
organization that encourages coordination
Lower US 2 to pass under the North Spokane
Start: Spring
2009 Complete: Summer 2009
Perry
Street
Washington State with
456,000 residents. Spokane
SRTC is a transportation policy-making
Corridor interchange. Build six new bridges for the
20. Sprague Avenue/Pines Road
Curb-to-curb rehabilitation of Southeast Blvd. from
largest city in
Washington, with approximately
NSC/US 2 connection.
than 50,000 is required to have a MPO.
Replace Sprague approaches to the Sprague Ave. and
29th Ave. to Perry St. including replacement of a
Valley is the seventh
most populated county in
Start: Under construction. Complete: 2011
Any urbanized area with a population greater
Pines Rd. intersection with concrete pavement.
distribution main.
The City of Spokane
Spokane County is the fourth
(MPO) for Spokane County.
4. US 2 to Wandermere Project
Start: Spring 2009
Complete: Summer 2009
Start: Spring 2009
Complete: Summer 2009
Planning Organization
Construct concrete driving surface for north
21. 44th Avenue from Sands to Woodruff
designated Metropolitan
and southbound lanes and two structures over
37. 37th Avenue from Perry Street to Regal Street
Install pedestrian pathway and bike lanes from Van
SRTC is the federally
Full depth curb-to-curb rehabilitation of 37th Ave.
www.spokanecity.org
www.srtmc.org
on the internet go to:
Wandermere Drive on the North Spokane Corridor.
Marter Rd. to Sands Rd. along 44th.
from Perry St. to Regal St. including curbs and
Or visit our web site at:
To view Interstate 90 traffic cameras in Spokane
Start: Summer 2009
Complete: 2011
Start: Spring 2009
Complete: Summer 2009
sidewalks in various locations and replacement of a
5. I-90/Medical Lake Rd. Bridge-Deck Repair (MP 269)
transmission main and a distribution main.
(509) 625-7733
(509) 324-6015
Repair existing bridge deck surface and overlay with
SPOKANE COUNTY
Start: Summer 2009 Complete: Fall 2009
Spokane Pothole Hotline:
Spokane, WA 99207
are not included.
a concrete surface, reducing traffic to a single lane
2714 N. Mayfair
little or no impact on area roadways
across the bridge.
22. Bigelow Gulch Road from East Weile Road to
38. Lincoln Street from 17th Avenue to 29th
(509) 625-6700
Public Information Officer
Start: Early Spring 2009 Complete: Late Spring 2009
Jensen
Road
Avenue
Spokane, WA 99201
Al Gilson
Projects that were deemed to have
Reconstruct Bigelow Gulch Rd. from Weile Rd. to
Full depth curb-to-curb rehabilitation including
808 W. Spokane Falls Blvd.
transportation construction projects.
6. I-90/Geiger Interchange to WSP (MP 276)
Jensen Rd. Widen to five lanes and shoulders.
adding curb extensions with storm water drainage
Engineering Services, City of Spokane
For more information, please contact:
This map does not show all regional
Construct fiber optic communications and camera
Start: Summer 2009
Complete: Summer 2010
in various locations.
link from the WSDOT network along I-90 to
Start: Summer 2009
Complete: Fall 2009
For more information, please contact:
Routes, and State Routes.
Washington State Patrol headquarters.
Delays are possible.
23. Freya Street from Wilding Avenue to Lincoln
high-speed roadways, including Interstate 90, all U.S.
Start: Spring 2009 Complete: Spring 2009
Road
39. Montgomery Avenue from Astor Street to
need specific information about various projects.
The Eastern Region maintains about 1,600 miles of

during the 2009 construction season.
Reconstruct Freya St. from Wilding Ave. to Lincoln

Hamilton Street, et al.
Throughout the road construction season, you may
guarantee that projects will be built
7. I-90/Rut Repair & Ramp Paving (MP 281-284/
Ramps
276-288)
Rd., widen to three lanes, add sidewalks and swales.
Rehabilitation of streets to include a combination of
Northeast Washington.
Inclusion on this map does not
and 716 miles of residential streets.
Grind freeway from the Division St. Interchange
Start: Spring 2009
Complete: Winter 2009/10
grinding and overlaying asphalt and full depth curb-
for all state highways in the seven counties of
approximately 255 miles of arterials
through Hamilton St. Asphalt overlay of I-90 from
to-curb rehabilitation of Montgomery Ave. from Astor
Eastern Region is based in Spokane and is responsible
24. Freya Street Sidewalks
58.7 square mile area, the City has
Hamilton St. to Dearborn St. Resurface many on
St. to Hamilton St. and surrounding neighborhood
The Washington State Department of Transportation/
Widen Freya St. from 57th Ave. to 62nd Ave., install
in Washington State. Within its
and off ramps from the Geiger Interchange to the
streets.
sidewalks, storm sewer, curb, and gutter.
Spokane is the second largest city
Sullivan Interchange.
Start: Spring 2009
Complete: Summer 2009
Start: Summer 2009
Complete: Fall 2009

more than 200,000 residents.
Start: Spring 2009 Complete: Late summer 2009
40. Five Mile Road from Austin Road to Lincoln
25. Nelson, Jackson, Oregon, Jefferson Road
The City of Spokane is home to
8. I-90/Sullivan to Idaho (MP 291-299)
Street
Improvement
District
Construct a fiber optic link along I-90 from the
Widen and repave including curbs, sidewalks, bike
Pave gravel roads between Conklin Rd and Pend
Sullivan Interchange to the vicinity of the Idaho
lanes, planting trees, adding sewer and water lines,
Oreille County Line.
border. Add four new traffic cameras and upgrade
swales, a truck climbing lane, and left turn lane.
Start: Summer 2009
Complete: Fall 2009
two plus a westbound message sign near the Port
Start: Spring 2009
Complete: Fall 2009
CONSTRUCTION 2009
Instead of sitting alone in traffic caused by
of Entry.
26. Elder Road Bridge Rehabilitation
road construction or traffic jams, consider
Start: Summer 2009
Complete: Spring 2010
Repair bridge over railroad tracks at Elder Rd.
41. Francis Avenue and Nevada Street

the alternatives:
2009
Start: Summer 2009
Complete: Fall 2009
Intersection
9. I-90/Port of Entry (MP 298)
The 2009 road construction season is
Install concrete intersection at Francis Ave. and
Construct new Port of Entry facility for the
27. Bigelow Gulch Road from Havana Street to
under way, with lots of work planned to


Carpool
Nevada St. and improve traffic signals (timing and
Washington State Patrol approximately one mile
Palmer
Road
improve our road system. We understand

• Ride the bus
new signals).
west of the current facility. Add “Weigh-In-Motion”
Reconstruct Bigelow Gulch Rd. and widen to five
Start: Summer 2009
Complete: Fall 2009
that construction can cause inconvenience,


Vanpool
equipment and signage to westbound lanes.
lanes and shoulders.
so Spokane Regional Transportation


Bicycle
Start: Spring 2009
Complete: 2010
Start: Spring 2009
Complete: Summer 2009
42. Altamont Boulevard from 11th Avenue to
SPOKANE REGIONAL
Council, Spokane County, the City of


Walk
10. Guardrail and Signage Safety Restoration

Ninth Avenue, et al.
28. Country Homes Southbound from Division
Spokane, the City of Spokane Valley, and

• Work from home
Update guardrail sections and signage in highway
Rehabilitation of streets to include a combination of

Street to Wall Street
ROAD CONSTRUCTION MAP
the Washington State Department of
grinding and overlaying asphalt and full depth curb-
Grind and overlay with new asphalt on southbound
The Spokane County Commute Trip
sections that were chip-sealed in previous seasons.
to-curb rehabilitation of Altamont Blvd. from 11th Ave.
Transportation have coordinated to provide
Start: Spring 2009
Complete: Fall 2009
Country Homes Blvd. from Division St. to Wall St.
Reduction Program can help you find an
to Ninth Ave. and surrounding neighborhood streets.
you with a comprehensive look at the road
Start: Spring 2009
Complete: Summer 2009
alternative to driving alone, and reward
11. US 195/Rosalia (SR 271) to Spangle Vicinity
Start: Spring 2009
Complete: Fall 2009
construction projects you will encounter in
29. Pinery Neighborhood Phase 2
you for it!

(Cornwall Rd.) Rumble Strips (MP 62-81)
2009.
Grind rumble strips into the center line of US 195 to
Repave neighborhood streets in conjunction with
43. Buckeye Avenue and Grace Avenue from
sanitary sewer project north of US 2 between Farwell

Ruby Street to Upriver Drive
Log on to www.mycommute.org
enhance motorist safety.
Elementary and Shady Slope Rd.
Replace existing water main and repave including
Major construction projects that are
Start: Summer 2009
Complete: Summer 2009
for more information.
Start: Spring 2009
Complete: Fall 2009
installation of curbs and sidewalks in some locations.
expected to impact traffic are listed on this
12. US 2/North Glen-Elk Chattaroy Rd.
Start: Spring 2009
Complete: Fall 2009
map. Projects with minor impacts, and the

Intersection Improvements (MP 302)
The City of Spokane Valley provides partial funding for
most up-to-date construction information,
Add northbound right-turn lane to provide access
paving and drainage improvements in conjunction with
44. Westside Transmission Main Phase 3
can be found on the Spokane Regional
to waste transfer facility and improve sight distance
the County sewer projects listed below. The result is fully
Install approximately 3 miles of water main from the
for vehicles entering US 2.
repaved streets in the areas impacted by each project.
Transportation Management Center web
West Drive Booster station located in the vicinity of 9th
Start: Late Summer 2009 Complete: Fall 2009
Ave. and West Drive to US 2/Spotted Rd. intersection.
site at www.srtmc.org. The site features
30. Clement Sewer Project
Start: Spring 2009
Complete: Summer 2009
38 live traffic cameras 24 hours a day and
Install sanitary sewers, repave streets. Area bounded
CITY OF SPOKANE VALLEY
maps that show the location of construction
by Flora Rd., Barker Rd., Appleway, and 8th Ave.
45. Fish Lake Trail Phase 2
Start: Spring 2009
Complete: Fall 2009
projects or other events, such as traffic
Construct approximately 4 miles of trail on
13. Appleway Boulevard/Sprague Avenue/
accidents and slowdowns, that could cause
abandoned railroad right-of-way at Sunset Hwy.
Dishman-Mica
Road
31. West Ponderosa Sewer Project
to the end of the paved trail north of Scribner Rd.
delays.
Upgrade signal controllers, install three traffic
Install sanitary sewers, repave streets. Generally,
including constructing a trailhead at the north end.
cameras and a message sign to connect to Spokane
area is in City limits west of Van Marter and south of
Remove an existing railroad bridge and rehabilitate
Regional Transportation Management Center’s
39th Ave.
four bridges. During construction there will be lane
central system. Constructed in cooperation with
Start: Spring 2009
Complete: Fall 2009
Thank you for your patience during the
obstructions to the I-90 off ramp and to US 195.
Washington State Department of Transportation.
2009 construction season.
32. Rotchford Acres Sewer Project
Start: Summer 2009 Completed: Fall/Winter 2009
Start: Spring 2009
Complete: Summer 2009
Install sanitary sewers, repave streets. Area south of 9th
46. Freya Street Bridge
14. Barker Road Bridge across the Spokane River
Ave., north of 16th Ave., east of Sullivan, west of Steen.
Commuting to Idaho?
Rebuild the Freya St. Bridge from Springfield to Trent

Construct new bridge with sidewalks, bike lanes,
Start: Spring 2009
Complete: Fall 2009
Spokane Regional Transportation Council
avenues including a concrete guardrail.
and parking across the Spokane River at Barker Rd.
Spokane County
For Kootenai County construction
33. Valleyview Sewer Project
Start: Summer 2009 Completed: Summer 2010
Started: Summer 2008 Complete: Spring 2010
City of Spokane
projects, please go to www.kmpo.net.
Install sanitary sewers, repave streets. Area south of
City of Spokane Valley
The Kootenai Area Construction Map
15. Broadway Avenue/Fancher Road
14th Ave., north of 19th Ave., east of Buttercup, west
47. Havana Street Overpass
Washington State DOT
Washington State Department of
Replace intersection of Broadway Ave. and Fancher
of Hazel. Drainage system upgrade at 16th Ave. and
Construct an overpass over the railroad viaduct on
can be found on the ‘Maps/Data/
Transportation
Spokane County • City of Spokane Valley
Rd. with cement concrete pavement.
Bettman Rd.
Havana St. north of Broadway Ave.
Publications’ page of that web site.
City of Spokane • Spokane Regional
Start: Spring 2009
Complete: Summer 2009
Start: Spring 2009
Complete: Fall 2009
Start: Summer 2009 Completed: Fall 2011
Transportation Council

Shady Sl
M
op
u
Spokane Regional Road Construction Map - 2009

e

Mt Spokane Park Dr
zz
Little Spoka ne Dr
y

R
d

R
29
d
d
Construction Projects
d
R
4
Interstate Highways
R

e
c

ill
3
u
Newman
r
M
Washington State DOT
Rutter Parkway
B
Major Roads/ Lak
Hig e
hways
Hastings R d
Waikik
Peone

Rd
i
City of Spokane
Rd
R
Minor Roads
egina Dr rD
1
City of Spokane Valley
Rail
rth
Stoneman

Rd
o
y Hawthorne
Rd
w
2
hitw
d
Spokane County
Water Bodies
0
0.5
1
1.5
Shawnee
Ave
W
R
ort H
t
Moffat
Rd
S
P
p
S

r

e
a
Fi
e
Miles
v
m

a

- Neighborhood Construction Areas
e
v
ew
k
Municipalities
n

d
M
e
r
ile Rd
e
l
a
Strong
Rd
N
o
a

28
v
F
Map Produced by SRTC - February 2009
S
e
t
Mi
d
N
t S
In
l
R

t

d
e
t
e
i
S
Lincoln
Rd
a
k
n

ar
Rd
d

n

r
a

N
T
e
o
r
C
i Coz
a
s
z
i
M
23
n
i
i
a
Dr

e

l

Bigelow
Gulch
Rd
M
R
t
v
40
S
i
22
d
d
i
d
R
l

l

D
l
d
R
e
R

a

o

d
R
d
h
27
t
W
St
S
Francis Ave
R

r
r

a
41
Francis Ave

t


n

a
n

a
d
t
I
t
t
l
S
t

t
S
S
S o
e
d
Joseph
Ave
S
B
t

d si

e

t
ne

y

S
t

R
l

A

S
o d
i
e
r
m

P
S
r
Rowan
Ave
b
R
h
o

e

ow
d
an
Av
l
e

o d
on
e
i

y

g
m

h
s

w A
r
s
t
l
i
n

T
rg
d
z
R
r
e
a
p

r
r
R
e
n

e

34
s
A
e
r
e

C
e
ol
A
Gilbert Rd
i
s
d
s
s
umb ia Dr
M
g
P
C

n

s

k
Kildea Rd
a
R
A
d
e
R
W
c
35
e
e
h
t D
i
Wellesley
Ave
llesley Ave
d
d
d
r
d
M

n

C
S r
L
S
t

d
R
o
i
g
s
s
R

G

c
Upriver
r
R
y R

d

D
e
n
p
Rd
o
r
r
a

v

r

e
l
Empire
Ave
a
e
m
r
l

Mar
E
v
d
i
B
Garland
Ave
in
k
g
nne
r
n
S Rive
l
o
D
r
NW B v
r
e
y

r
e
a
d
t
F
Empire Ave
a
S
B
Euclid
Ave K
Ly
Bridgeport Ave
Euclid
Ave
H
Frederick
Ave
Empir e Wy
ppleway Ave
9
l
S
t

A
v

e

e
D
d
o st
v
ownriver Dr
r
n o

43
P
t
North
Foothil ls Dr
Trails Rd
o
S
t
Rutter Ave
Marietta A
G
Pe
S
14
o
t
M

n


y

M o ntgomery
A
v
te
o
v
Indiana A
e
ve
39
e
t

t
b
d
17
r
g
u
n
D
7
n
R
th Riverton
Ave
Mission Ave
Trent Ave
R
i
Mission
Ave
m
r
u

a

h
t
r
e
Maxwell Ave s
t
d
d
d
7
n
So S
Li
a
o
La
16
t

S
Sharp
Ave

a

R
R
l
R
8
F
be
W
Boone
Ave
W

a

p
k

r

n

d

a
46 47St
l
e r
e
y
a
t
15
R t
Broadway
Ave
e
l

N
a

i
s
t
a

d
r
Broadway
Ave
l
y
e
7
V
R
e Valleyway
Ave
o
d
H
a
n


r

a
v

r
H
M
Riverside
Ave
Sprague Ave
a
Rd
13
20 19 18
Gre
H
F
e nwo od
Rd
Sprague
Ave
4th
Ave

y

7
30
S
t

r
d
d
n
L
5th
Ave
r

8th
Ave
R
8th
Ave
R
e
i
o
b

n

k
Rd

Liberty

d

d
H
e
West Dr
I
6th
Ave
h
n
SE
T
a
l
R
r
d
7 l
t
a
h
Par
d
a
Bl
42

s

32
y
R
n
a
R
16th
Ave
n
v
n
44
33
o
m
D
Lake
d

d

d
r
E
14th
Ave t
17th
Ave
r

y
t

d
a
m
S
a
i
c
d
t
t
e

G
C
s
r
r
d
A
o
p

d

d
M
r
a
e
R
R
lvd
i
r

a
n
v
S
p

B

e

i
7
38
36
n
d

St

s


e

24th Ave
d
r
n
d
e
k
R
W
e
B
Ray
U
R
n
i

l

n

d
y
H
B
v
eiger
d
29th
Ave

h

P
B la
a
R
G
i
s
v
g
i
i
t
t
32nd
Ave
l

n

h

S
S
d
l
a
Spokane

l

w
u
D

y

a
S
m
r
25
g
37th
Ave
o
6
r
r
B
Belle Ter
p
r e Ave
a
County
e
e
37
P
R
h
C

Thorpe Rd
d
S
t
Inset
S
44th
Ave
R
al
d
a St
d
t
d
e

21
y
e
Electric Ave
R
R
49th
Ave
e
R
se
l
y

e

H
Fr
ica
31
b
n
a
Glenro se
d
a
t
R
12
k
c
r
e
s
t
l
i
n

-M
L
o
h

d
ak e
C
C
R
an
s
s
e
m

Sp
A
R
e
d
57th
Ave
m
d
a
l

24
ar
e
g

i
sh

heney
C
R
63rd
Ave
R
D
Hallett Rd
d
65th
Ave
d
R
e

v

d
45
R
r
o
G

e
kinL

45
5
d
R
10
26
Hang
Ch eney-Spokane
m
d
a n
d
R
d
R

n

Valley
a
R
R
n

d
Belmont Rd
11
m
r

re
i
s
o

e
o
a
d

h
S

M
altim
B
Palouse Hwy