Managing Variability Wind Farm At Deli Farm, Delabole, Cornwall ...
MANAGING VARIABILITY
Wind Farm at Deli Farm, Delabole, Cornwall. Photo: Report author
David Milborrow
Energy Consultant
E-Mail: david.milborrow@btinternet.com
24 June 2009
A report to WWF-UK, RSPB, Greenpeace UK and Friends of the Earth EWNI
1
The author
David Milborrow is an energy consultant with 31 years experience in renewable energy. He
was first involved in aerodynamic research at the research laboratories of the Central
Electricity Generating Board before moving to their headquarters in 1984. From then until
1992 he was associated with policy development, including plans for some of the UK’s first
wind farms.
His association with variability issues goes back to 1988, when he managed a study for the
CEGB that was one of ten carried out under the auspices of the European Commission. After
privatisation -- and becoming an independent consultant in 1992 -- he completed further
studies on the topic for a number of clients including the Canadian Wind Energy Association,
Sustainable Energy Ireland, the Carbon Trust and the UK DTI. He also lectures on the topic at
three universities.
He retains an interest in aerodynamic and engineering issues and has also carried out a number
of studies on the economics of renewable energy sources, and comparisons with those of the
thermal sources of electricity generation. He is, or has been, an adviser to a number of bodies
including the European Commission, the DTI, and the Engineering and Physical Sciences
Research Council. He is technical adviser to the journal WindPower Monthly and to the
British Wind Energy Association.
Disclaimer
Every attempt has been made to ensure accuracy but acceptance and use of this report by the client
and others is on the basis that the author is not held responsible for the application or use made of
the data or analysis and that such responsibility remains with the client or user.
2
SUMMARY
In order to comply with legislation from the European Union, the UK’s renewable energy target (to
produce 15% of final energy consumption from renewable sources by 2020) may require between 35
and 40% of our electricity to come from renewable energy sources by 2020. After 2020, a higher
proportion may be needed. A significant amount of this renewable electricity is likely to come from
wind, and the variability of this power needs to be managed. Although aspects of the management of
wind variability can be controversial, utilities the world over generally agree that there is no
fundamental technical reason why high proportions of wind energy cannot be assimilated into the
system. There is a large body of literature on the topic and the steady growth of wind power,
worldwide, indicates that it is seen as a robust choice for reducing greenhouse gas emissions.
An understanding of the impacts of the variable sources of renewable energy must take into account
the wider issues associated with managing electricity systems. Modern integrated networks are
designed to cope with ‘shocks’ such as the sudden loss of large thermal power stations and with
uncertainties in consumer demand. As the tools to deal with these are already available the key
question is the extent to which the introduction of large amounts of wind energy will increase the
overall uncertainty in matching supply and demand.
This extra uncertainty means that additional short-term reserves are needed to guarantee the security
of the system. The extra cost of these reserves -- with wind providing 20% of electricity consumption
– is unlikely to be more than £1.20/MWh on electricity bills (a little over 1% on domestic bills). With
40% of electricity provided by wind, the corresponding figure would be £2.8/MWh.
The costs of additional reserves are one component of ‘the costs of wind variability’. A second is the
backup cost and the third is ‘constraint costs’. No special backup provisions need to be made for wind
energy. All generating plants make use of a common pool of backup plant that is typically around
20% of the peak demand on the electricity network. When wind is introduced, system operators do
not rely on the rated power of all the installed wind farms being available at the times of peak
demand, but a lower amount - roughly 30% of the rated capacity at low penetration levels, falling to
about 15% at high penetration levels. This lower ‘capacity credit’ gives rise to a modest ‘backup
cost’. ‘Constraint costs’ arise when the output from the wind turbines exceeds the demand on the
electricity network. They are unlikely to arise until wind energy is contributing around 25% of
electricity requirements.
Overall, it is concluded that the additional costs associated with variability – with wind power
providing up to about 40% of all electricity, are quite small. If wind provides 22% of electricity by
2020 (as modelling for Government suggests), variability costs would increase the domestic
electricity price by about 2%. Further increases in the level of wind penetration beyond that point are
feasible and do not rely on the introduction of new technology.
There are numerous technical innovations at various stages of development that can mitigate the costs
associated with variability. Improved methods of wind prediction are under development worldwide
and could potentially reduce the costs of additional reserve by around 30%. Most other mitigation
measures reduce the costs of managing the electricity network as a whole. ‘Smart grids’, for example,
cover a range of technologies that may reduce the costs of short-term reserves; additional
interconnections with continental Europe, including ‘Supergrids’ also deliver system-wide benefits
and aid the assimilation of variable renewables. Electric cars hold out the prospect of reduced
emissions for the transport network as a whole and could act as a form of storage for the electricity
network -- for which the electricity generator would not have to pay.
3
CONTENTS
SUMMARY ................................................................................................................................................. 3
1. INTRODUCTION.................................................................................................................................... 5
2. ELECTRICITY NETWORKS ................................................................................................................. 6
2.1 Economies of scale ............................................................................................................................. 6
2.2 Demand fluctuations........................................................................................................................... 6
2.2.1 Operational reserve ...................................................................................................................... 7
2.2.2 Costs of reserve............................................................................................................................ 8
2.3 Plant margin, or ‘backup’ ................................................................................................................... 8
3. CHARACTERISTICS OF WIND ENERGY........................................................................................... 8
4. INTEGRATING WIND ......................................................................................................................... 10
4.1 Extra short-term reserve needs and costs ......................................................................................... 11
Figure 4. Estimates of additional balancing costs for Great Britain................................................... 12
4.1.1 Carbon dioxide savings.............................................................................................................. 12
4.2 Extra back up and its costs ............................................................................................................... 13
4.2.1 Capacity credit ........................................................................................................................... 13
4.2.2 The cost of backup ..................................................................................................................... 14
4.2.3 Transmission constraints............................................................................................................ 14
4.3 Wind surpluses at high penetration levels ........................................................................................ 15
4.3.1 Impact of new nuclear and coal-fired plant ............................................................................... 16
4.4 Total costs of variability................................................................................................................... 16
Figure 8. Additional costs associated with variability........................................................................ 16
4.5 Types and costs of plant used for reserve......................................................................................... 17
5. MITIGATING THE EFFECTS OF VARIABILITY ............................................................................. 17
5.1 Wind forecasting .............................................................................................................................. 18
5.2 Higher productivity from offshore wind .......................................................................................... 18
5.3 Demand management ....................................................................................................................... 18
5.4 Energy Storage.................................................................................................................................. 19
5.4.1 Dedicated storage....................................................................................................................... 19
5.4.2 System storage ........................................................................................................................... 20
5.5 Additional international connections................................................................................................ 20
5.5.1 European Supergrids.................................................................................................................. 21
5.6 Electric cars ...................................................................................................................................... 22
5.7 ‘Smart grids’ and the growth of de-centralised generation .............................................................. 22
5.8 Electric space and water heating ...................................................................................................... 23
5.9 The Hydrogen economy ................................................................................................................... 23
5.10 Overall effects ................................................................................................................................ 23
6. EXPERIENCE ELSEWHERE............................................................................................................... 24
6.1 Germany ........................................................................................................................................... 24
6.2 Denmark ........................................................................................................................................... 25
7. CONCLUSIONS ................................................................................................................................... 25
APPENDIX 1. Capacity Credit ................................................................................................................. 27
APPENDIX 2. Conflicts between Wind and Large Conventional Thermal Baseload Plant ..................... 28
APPENDIX 3: Electric Cars ...................................................................................................................... 29
APPENDIX 4. Glossary ............................................................................................................................. 30
REFERENCES........................................................................................................................................... 31
4
1. INTRODUCTION
Meeting the European Union's Directive that 15% of UK final energy consumption should come from
renewable sources by 2020 demands a significant increase in the proportion of electricity that comes
from renewable sources. Modelling for the Government suggests that this level may be about to 32%1
and suggests that wind energy will contribute a major share -- about 22%i of electricity production in
the UK by 2020.
Numerous misconceptions surround the issues associated with the integration of the variable sources
of renewable energy into electricity networks. "What happens when the wind stops blowing", is a
common question -- the implication being that the lights may go out. "Every megawatt of wind
energy needs a megawatt of backup plant", is a slightly more sophisticated -- but still incorrect --
assertion.
So where does the truth lie? In a nutshell: nothing will happen when the wind stops blowing, simply
because it never stops blowing, suddenly, over the whole of the British Isles. The variations from
distributed wind are generally less than the demand fluctuations regularly encountered on electricity
networks. To cope with these, every network has reserves scheduled at all times and what matters is
the additional reserve needed to cope with the variability of wind. That is only a few percent of the
rated power of wind plant -- not 100%.
There are also concerns that a system with a high proportion of variable renewables would risk power
cuts at times of peak demand. The ability of wind energy to contribute to these peak demands needs to
be examined. This introduces the concept of ‘capacity credit’ -- how much thermal plant can be
retired with the introduction of wind energy?
National Grid, in common with other electricity utilities, is on record affirming that any limits to the
penetration of wind energy are likely to be economic rather than technical. As the proportion of wind
energy rises above about 20-25%, it may be necessary to constrain wind output at times. The aim of
this paper is to clarify the issues in more detail, drawing upon the analysis that has been carried out
during the past 30 years (one recent review identified over 150 references2) and also to review ways in
which the impacts of variability may be mitigated.
This report is structured as follows: -
•
A brief description of electricity network issues comes first as this is essential background to
discussions of issues surrounding the integration of variable renewable energy sources.
•
Next comes an examination of exactly what is meant by ‘wind variability’. (‘Variable’ is a
better description of the power fluctuations from wind, wave, etc than ‘intermittent’).
•
The next section deals with the integration of the variable sources into power systems, the
costs and other issues.
•
The final section deals with ways in which the additional costs might be mitigated and covers
concepts that are available now through to some of the more conceptual possibilities that are
currently under discussion.
Most of the literature relating to variability issues is linked to the performance of wind energy, so this
is reflected in the paper. The issues associated with the other variable sources are similar in many
respects, although there are important differences.
i Unless otherwise stated, wind energy penetration levels in this report are the proportion of GB electricity supply
(on an annual basis) that comes from wind energy. Not all the references that are cited distinguish between
"production" and "consumption", but this is unlikely to make material differences.
5
2. ELECTRICITY NETWORKS
It is impossible to analyse the impacts of variable renewable energy sources on an electricity network
without reference to the characteristics of the network itself. All electricity networks need to manage
unpredictable fluctuations in consumer demand and plant breakdowns. They do this by looking at the
performance of the system as a whole, rather than by focusing on any one type of plant. ‘Short-term
operational reserve’ ensures that plant is available to cope with unexpected power fluctuations in the
short term and the ‘plant margin’, or ‘backup’ -- the excess of installed capacity over and above the
expected peak demand -- ensures that there is always adequate power available to meet consumer
demands. Aggregating both demand and supply realises significant savings and ensures that the
operational reserve and the plant margin are no larger than necessary. Thermal plant outputs, such
as nuclear, coal and gas-fired power plant are truly ‘intermittent’, inasmuch as they can disappear
without warning when components fail, posing a greater threat to the stability of electricity networks
than the relatively benign fluctuations of power output from wind installations.
2.1 Economies of scale
‘Economies of scale’ have a dramatic effect on the performance of electricity networks. The bigger
the network, the lower, potentially, is the cost of electricity to consumers. Savings accrue partly from
the use of large, highly efficient generating units, but also from the plant savings that result from the
aggregation of demand and generation. The greater the aggregation, the smaller (in proportion) are the
variations in demand and the easier it is to predict them. At one end of the spectrum, the minimum
demand from a domestic dwelling in the UK is a few watts, the average is about 0.5 kW and the
maximum is 5 to 10 kW (10 to 20 times the average). If each household met its own maximum
demand - 5 kW, say, then 100 GW of generating plant would be needed for the domestic sector, alone.
In practice, only about 75 GW of plant is needed for all consumers - domestic, commercial and
industrial. Aggregation smooths variations in demand from all sectors and so, nationally, the
maximum demand in Great Britain is 60 GW, about 1.5 times the average demand. Smaller electricity
systems need, in proportion, more plant. To illustrate the point, the ratio between the installed
capacity in Great Britain (78.7 GW) and the average demand in 2006 was almost exactly 2. In
Bermuda (175 MW of plant) that ratio was 2.47 and in the Faroe Islands (86 MW) it was 2.773.
Although large integrated electricity systems are efficient they still require ‘operational reserve’ to
deal with short-term mismatches in supply and demand and a ‘plant margin’ (additional plant, over
and above that required to meet the maximum demand) to deal with plant breakdowns and other
outages. The effect of wind energy on the short-term reserves and margin needs is the subject of much
discussion and in this report each issue is discussed in the context of electricity networks.
2.2 Demand fluctuations
Although aggregation smooths variations in consumer demand, there are still substantial fluctuations
when numbers of consumers together increase power needs – at the morning and evening rush hours,
for example. Figure 1 (left) illustrates the demand variations on 9 January 2009. From a night-time
minimum of just over 40,000 MW at 0500 hrs, demand rose rapidly to just under 54,000 MW at 1000
hrs. It then fell off slightly until there was another surge in demand at the evening peak of just under
60,000 MW, reached at 1730. Demand then fell off steadily. The intra-half hourly changes in
demand are shown in the right-hand figure. During the morning peak the maximum change between
two successive half hours was 2300 MW and during the evening peak was 3100 MW. Negative
changes in demand were recorded from 1800 hrs onwards, reaching a maximum of 2600 MW at 2230.
6
GB system demand, MW
Change from previous half-hour, MW
60,000
4,000
3,000
55,000
2,000
1,000
50,000
0
-1,000
45,000
-2,000
-3,000
40,000
0
10
20
30
40
50
0
10
20
30
40
Half-hourly periods
Half-hourly periods
Figu
re 1. Demand fluctuations in Great Britain on 9 January 2009.
2.2.1 Operational reserve
All power systems, with or without wind energy, need short-term operational reserve, often called
‘spinning reserve’. The terms cover various types of plant with different characteristics, outlined
briefly below. Nomenclature varies between utilities, but the exact details are not central to this
discussion.
Most of the demand changes shown in Figure 1 are reasonably predictable but absolute precision is
unrealistic. The weather is a key driver of electricity demand, although other factors come into play.
Apart from demand uncertainty, there is also the possibility of plant breakdowns. The standard error
in the supply/demand balance is around 2%, 24 hours ahead, falling to about 1.3% four hours ahead.
To deal with these uncertainties, various types of plant – the ‘short-term operational reserve’ - are
used to ensure that supply and demand are matched and that system frequency is kept as close as
possible to 50 Hz. The principal types of plant are: --
•
Frequency response: such plant automatically adjusts its output, increasing it when system
frequency is low and vice versa.
•
Fast reserve: this plant is able to increase or decrease its output, under instruction from
National Grid on a short timescale (typically half an hour)
•
Standing reserve: similar to fast reserve, but on a longer timescale (typically 1-4h).
In the UK, the operational reserves are mostly part-loaded thermal units. They operate at below
maximum capacity, so that the output can be increased or decreased to cater for mismatches between
generation and demand. Pumped storage plant is also used, as it can respond very rapidly to a need
for more generation.
The requirement for operating reserve in Great Britain is around 3850 MW at the winter peak, based
on uncertainties in demand and generation up to four hours ahead4. The level of uncertainty at any
given time dictates the level of reserves, although other factors come into the equation. When the
demand on the network in England and Wales is 40,000 MW (around the average level) then around
2200 MW of frequency response plant is required if a sudden loss of a 1200 MW power station is a
‘worst case’ scenario5.
It is important to note that the levels of reserve scheduled at any particular time ensure that the
electricity network operates in a stable manner, with a defined level of risk. 100% risk-free operation
is unrealistic. No power stations are 100% reliable and to suggest that “Nuclear is not intermittent;
neither is fossil fuel generation…6” is misleading, as thermal plant can, and do, ‘trip’ without
7
warning. This can lead to the instantaneous loss of several hundred megawatts of generation, such as
the incident, which occurred in May 20087.
2.2.2 Costs of reserve
The costs of the reserve reflect the fact that they need to operate at part-load (and lower efficiency).
Annual costs of frequency response plant are around £145 million and each of the other types was
expected to cost around £60 million in 2008/098.
The costs of reserve depend on the precise type and price structure. Average UK levels are broadly in
line with international values, and are in the range £4-8/MW-h ii, although some fast response plant,
such as pumped storage, secures higher values. These costs compensate the plant owners for the lower
efficiency of plant whose output is below its maximum, extra wear and tear, and possibly extra
controls; they are additional to payments for the energy actually generated.
2.3 Plant margin, or ‘backup’
Reserves ensure minute-by-minute system security but longer-term security is managed by making
sure that there is always enough plant available to meet the highest demands on the electricity
network. The ‘Plant margin’ is a measure of the difference between the total capacity of the plant on
the network and the expected maximum demand. The desirable plant margin (plant capacity minus
maximum demand) for a large system such as that of Great Britain is modest – around 24%9.
Maximum demand in Great Britain last winter (2008/9) was around 60 GW and so there needs to be
at least 73.2 GW of plant – which there is. This does not guarantee that the lights will never go out
but ensures this will happen very rarely. The high level of security and low plant margin stems from
the fact that a large system has a number of generating units each with a quantifiable probability of
failure, but the combined probability of, say, three units failing at the same time, is much less. It may
be noted that the plant margin in the UK has been higher than the theoretical figure for many years. It
is very difficult to design a market that delivers the theoretically desirable optimum, simply because
power plant equipment takes a long time to build, and plant closures are not always easy to predict in
advance.
3. CHARACTERISTICS OF WIND ENERGY
Contrary to popular perception, wind energy is not totally random and unpredictable. It is variable,
rather than intermittent as wind outputs, aggregated over the whole country, fluctuate in a way that
can be quantified. A reasonably consistent picture comes from analyses of power fluctuations (real
and simulated) in Denmark, Germany and the UK. With 3000 MW of wind in Britain, generating, say,
1000 MW at noon, the output at 1300 hrs will most probably lie between 910 and 1090 MW. The
probability of it lying outside this range can be quantified, so providing a basis for combining
‘demand uncertainty’ with ‘wind uncertainty’.
The need to schedule reserves to cover for possible trips of conventional thermal plant emphasises the
point that no generation is 100% reliable. The loss of 1000 MW of thermal plant is a real risk, but it
is extremely unlikely that 1000 MW of dispersed wind will disappear instantaneously. As wind
capacity increases, the increased geographical spread reduces the fluctuations, and so sudden changes
of wind output across the whole country do not occur. The smoothing effects of geographical
dispersion are quite dramatic. Using one statistical measure, the fluctuations across western Denmark
ii These prices derive from a holding charge and a usage charge. The prices of frequency response plant moved
upwards from October 2005, following changes to the administrative arrangements.
8
are about one quarter of those measured on a typical wind farm and figure 2 illustrates this point
graphically.
Wind power output
2500
2000
1500
1 farm (kW)
West DK (MW)
1000
500
0
0
10
20
30
40
Time in hours
Figure 2. A comparison of the fluctuations from a single wind farm (dashed line, output in kW) with
the fluctuations in the whole of western Denmark (solid line, output in MW).
An analysis of the wind power fluctuations in Western Denmark in 2007 suggests that for 42% of the
year (3700 hours) the intra-hourly fluctuations were within the range plus or minus 25 MW (1% of
the wind capacity). Extending the range to plus or minus 50 MW captures another 1800 hrs of
fluctuations. At the extremes, fluctuations in excess of plus or minus 375 MW (16% of capacity) only
occurred 10 times in the year. The complete histogram of power swings is shown in Figure 3.The
standard deviation of the fluctuations is around 3%. Comparisons with an analysis carried out by
National Grid for Great Britain have yielded very similar results. They are summarised in Table 1 and
compared with other data10. This table also includes data that shows how aggregation of wind power
fluctuations reduces, in proportion, the magnitude of the standard deviation and of the maximum
excursions. Information of the type shown in table 1 and figure 3 provides a basis for estimating the
effects of integrating wind energy into an electricity network.
% time
100
10
1
0.1
0.01
-20
-10
0
10
20
Intra-hourly power swing
% of installed capacity
Figure 3. Intra-hourly power swings observed in Western Denmark in the year 2007. Note that these
never exceeded around 18% (up or down) and the standard deviation was about 3%.
9
Standard deviation
Maximum swing
Lead time, hr 1
4
1
4
Nation-wide
NGC11 and Ilex12
3.1
9
-14, +18
-21, +29
Danish (W) data (2007)
3
10
-16, +18
-49, +56
Single wind farm
11.8
20.8
-90, +60
-100, +100
Table 1. Summary of data on power swings for Great Britain and Western Denmark and a
comparison with single wind farm data. Some data from western Denmark have been updated from
the original source.
4. INTEGRATING WIND
Numerous electricity utilities around the world have examined the implications of absorbing wind
energy and most have concluded that the additional costs are modest and there are no insuperable
difficulties. The additional costs can be derived by looking at the overall uncertainty when supply
fluctuations (due to plant breakdowns) are combined with demand uncertainty and wind uncertainty.
That enables the amounts of additional short-term reserve to be derived. The costs of that reserve can
then be calculated. National Grid estimates these additional costs for 40% wind will not exceed about
£7/MWh of wind (roughly 10% extra on top of its generation cost).
Contrary, again, to popular perceptions, wind does not need to be ‘backed up’, megawatt for
megawatt. Numerous authoritative studies have shown that it can displace thermal plant. At low
penetration levels the volume of this thermal plant roughly equals the average power of the wind
plant, but the volume declines -- in percentage terms -- with increasing amounts of wind energy. This
does give rise to a small ‘backup cost’. When this is added to the additional costs of operational
reserve, the total extra cost to the consumer, with 20% wind, is expected to lie between £1.5/MWh and
£2.5/MWh. With 40% wind, the additional cost is estimated to lie in the range £5-7/MWh. Higher
penetration levels are feasible.
When considering the introduction of the variable renewable energy sources it is important to
preserve the advantages of an integrated electricity network as that minimises the extra costs to
electricity consumers. National Grid has made this point13: -
“However, based on recent analysis of the incidence and variation of wind speed we have found that
the expected intermittency of wind does not pose such a major problem for stability and we are
confident that this can be adequately managed…
It is a property of the interconnected transmission system that individual and local independent
fluctuations in output are diversified and averaged out across the system.
The effects of adding wind to an electricity network may be illustrated by the case of western
Denmark, and examining the changes in demand that need to be managed. If there had been no wind
installed there in 2007, the maximum one-hour increase in system demand would have been 675 MW.
With 26% wind (the amount on the system that year), sometimes the wind fluctuations augmented the
demand fluctuations, sometimes they reduced them. The maximum increase in demand that the
System Operator had to deal with went up from 675 MW to 900 MW. In that hour, there was an
increase in demand at the same time as the output from the wind plant fell. However, the number of
times that the net demand increased by more than 600 MW in an hour only went up from 55
(consumer demands only) to 63 (consumer demand net of wind production). Even with 39% wind
10
(scaling up 2007 wind outputs by 50%), there would only be about 75 occasions when the net increase
in demand exceeded 600 MW14.
The impacts of variability and the corresponding possibilities for mitigation can be studied by
examining the three principal ‘cost centres’: --
•
The costs of extra operational reserves (balancing costs), which can be reduced by
o
Reducing the ‘unpredictability’ of wind (by better forecasting), or
o
Reducing the cost of balancing services
•
‘Backup’, which can be reduced if the capacity credit can be increased, and,
•
‘Constraint costs’, due to surplus wind, which can be reduced if the surpluses can be reduced.
4.1 Extra short-term reserve needs and costs
Electricity networks with wind energy need extra reserves to deal with the extra uncertainty
associated with the presence of wind on the network. It is important to emphasise that this extra
uncertainty is not equal to the uncertainty of the wind generation, but to the combined uncertainty of
wind, demand and thermal generation. An American author has made this point15: -
“A key feature of the present analysis [of the effects of variability] is its integration of wind with the
overall electrical system. The uncontrollable, unpredictable, and variable nature of wind output is not
analyzed in isolation. Rather, as is true for all loads and resources, the wind output is aggregated
with all the other resources and loads to analyze the net effects of wind on the power system.
Aggregation is a powerful mechanism used by the electricity industry to lower costs to all consumers.
Such aggregation means that the system operator need not offset wind output on a megawatt-for-
megawatt basis. Rather, all the operator need do, when unscheduled wind output appears on its
system, is maintain its average reliability performance at the same level it would have without the
wind resource.”
The combined uncertainty is determined from a ‘sum of squares’ calculation that provides the basis
for estimates of additional reserve needs: -
σ2 (total) = σ2 (demand) + σ2 (wind)
σ is the standard deviation of the uncertainties.
Although the quantity of operational reserve rises with increasing amounts of wind energy, National
Grid is confident that it will be able to procure the necessary amounts, and, moreover, that there is no
‘ceiling’ on the amount of wind-generated electricity that can be accommodated16: --
“Based on recent analysis of the incidence and variation of wind speed the expected intermittency of
the national wind portfolio would not appear to pose a technical ceiling on the amount of wind
generation that may be accommodated and adequately managed.”
It may be noted that National Grid says nothing about the type of plant that may be needed for reserve
- that is left for the market to decide, provided it can meet the technical specifications set by National
Grid. In practice, it may be coal-fired plant, combined cycle gas turbines, or storage. The former
tends to be the most economic option, whilst the latter tends to be the most expensive. However,
pumped storage plant can respond extremely rapidly and so is well suited to a particular type of ‘fast
reserve’.
The characteristics of most electricity systems are similar, so estimates of the extra reserve needed to
cope with wind energy are also similar. With wind supplying 10% of the electricity, estimates of the
11
additional reserve capacity are in the range 3 to 6% of the rated capacity of wind plant. With 20%
wind, the range is 4 to 8%, approximately.
National Grid has recently quoted estimates of the extra balancing costs for wind in the UK for 40%
wind17. These would increase balancing costs in 2020 by £500-1000 million per annum (£3.5-7/MWh
of wind). The uncertainty arises partly because the future trajectory of balancing services costs is
uncertain (they are dependent on fuel prices), partly because increased use of the demand-side
management could reduce the overall costs. The way in which balancing costs are likely to increase
with wind penetration level is illustrated in figure 4. This makes use of the National Grid data as
‘anchor points’ and uses information on demand and wind uncertainty (discussed earlier) to
synthesise the rest of the curve. So 10% wind energy is likely to occur extra costs in the range £2.5-
5/MWh and 20% wind energy in the range £3-6/MWh, approximately.
Cost of extra balancing, £/MWh of wind
7
NGT
6
High
5
Low
4
3
2
1
0 0
10
20
30
40
Wind Energy penetration, %
Figure 4. Estimates of additional balancing costs for Great Britain
A recent American review18 quotes a study that looked at 30% penetration on a peak load basis
(probably about 15% on an energy basis) and that suggested an extra balancing cost of $8.84/MWh –
within the range of the National Grid data. Other international comparisons are discussed briefly in
Section 4.5
4.1.1 Carbon dioxide savings
As the extra reserve operates at part-load, its lower thermal efficiency means that its emissions
increase. The reserve still contributes useful energy to the system, so the extra emissions are those
associated with the reduced efficiency of part-loaded plant. Taking a pessimistic estimate of 10% for
the reduced efficiency, and taking into account the fact that the load factor of wind plant is just under
half that of thermal plant, Dale et al suggested that this reduces the emission savings from the wind, at
the 20% penetration level, by a little over 1%22. In other words if the displaced fuel is coal, for the
sake of argument, with CO2 emissions of 900 kg/MWh, then the effective CO2 saving would be
around 890 kg/MWh. If the displaced fuel were gas, with CO2 emissions of 400 kg/MWh, the
effective saving would be 395 kg/MWh. At higher penetration levels (40%, say), the non-linear
increase in the necessary reserves brings these figures down to around 875 kg/MWh and 388
kg/MWh, respectively.
20% wind energy corresponds to around 80 TWh iii and so the carbon dioxide savings would be
around 71 million tonnes per annum if coal is displaced (32 Mt if gas is displaced). With 40% wind,
the savings would be about 140 Mt and 63 Mt, respectively.
iii The exact amount that corresponds to 20% wind depends on assumptions about electricity requirements in
2020 and these vary.
12
4.2 Extra back up and its costs
A distinction must be drawn between the extra reserves needed for short-term balancing in an
electricity system with wind and the extra backup (if any) needed to guarantee the security of the
system at all times. That means making sure that there is always enough power available to meet the
peak demands of the system. Although some suggest that there is a need to provide ‘backup for
windless days’ to ensure that demands are always met19, this is misleading, on two counts: -
•
When a new thermal power station is built there is no discussion as to how the electricity
system will manage when the station is unexpectedly out of action for emergency repairs
during the winter. The ‘plant margin’ is a common pool of ‘extra’ plant that ensures peak
demands are met. No power stations are 100% reliable, as discussed earlier.
•
Not even the most zealous of renewable energy enthusiasts would suggest that System
Operators should rely on the full rated capacity of wind power plant. When wind is added to
an electricity network, the situation is not fundamentally different from an addition of thermal
plant. If the wind plant has some ‘capacity credit’ (discussed next) then it will be possible to
retire some of the older plant, without compromising system security. If the new plant has
zero capacity credit, then no plant can be retired, but, either way, no new plant needs to be
built for ‘backup’ – it already exists.
Estimates of capacity credit that are based on wind electricity production during a single winter are
unlikely to provide accurate estimates. It is a statistical quantity that requires adequate data -- as for
nuclear plant. During the winter of 2008/9, for example, at the time of peak demand, the metered
wind electricity production was about 18% of its rated outputiv. However, about 5000 MW of nuclear
output was not available, for various reasons - nearly 50% of the total20. It would be misleading to
assign a capacity credit of 18% to wind on the basis of this one instance, and equally misleading to
assign a ‘firm power’ contribution from nuclear as 50% of its rated output.
It is important to emphasise that the capacity credit of wind will never be greater than the plant
margin and even if the country had 26,000 MW of wind and had been completely becalmed at the
time of the peak demand on 6 January 2009, the plant margin would not have been used up, despite
the missing 5000 MW of nuclear. It is also worth reiterating that the plant margin is generally greater
than the theoretically desirable minimum.
4.2.1 Capacity credit
The term ‘capacity credit’ for wind, introduced above, tends to be controversial. It may be defined21
as follows: -
“The reduction, due to the introduction of wind energy conversion systems, in the capacity of
conventional plant needed to provide reliable supplies of electricity.”
Despite the controversy, numerous studies have confirmed that wind can substitute for thermal plant
and enable the British power system to operate with the same level of reliability. The issues are
discussed in more detail in appendix 1 and figure 5 shows how the capacity credit varies in megawatt
terms, as a function of the installed wind capacity.
iv National Grid does not monitor all the wind plant output, so this applies to the metered capacity.
13
Capacity credit, GW
8
7
6
5
4
3
2
1
0
0
10
20
30
40
Wind capacity, GW
Figure 5. Capacity credits as a function of wind capacity
4.2.2 The cost of backup
Although the ‘extra costs of backup’ are not derived by assuming the whole of the wind plant capacity
needs to be duplicated by standby thermal plant, there are extra costs associated with the low capacity
credit of wind at penetration levels above about 8%. With thermal plant, the average power and the
‘capacity credit’ are the same, but wind energy is different. Above the 8% penetration level
(approximately), the capacity credit of wind is less than its capacity factor. This means that 26,000
MW of wind, say, (roughly 20% energy penetration) delivers electricity that corresponds to around
10,700 MW of thermal plant (assuming a wind capacity factor of 35% and a thermal plant load factor
of 85%) but only displaces around 5000 MW of thermal plant. This has the effect of reducing the load
factor on the remaining thermal plant. Their generation costs increase, as capital cost repayments are
spread over fewer kilowatt-hours. This provides a basis for estimating the ‘additional costs of
backup’, using the methodology used by Dale et al22. Using an up to date price for combined cycle gas
turbine plant of £700/kW, these amount to around £2.5/MWh of wind (at 20% penetration), rising to
around £6/MWh of wind at 40% penetration.
Even if evidence should surface showing suggesting capacity credits are much lower than has been
assumed, the effect on the variability costs would be modest. At 20% wind energy penetration level,
for example, the additional variability cost would be about £1.7/MWh20.
4.2.3 Transmission constraints
The foregoing discussion has implicitly assumed that the electricity network can be operated as a
single unit, with unrestricted flows of energy. In practice, this is not always the case and there are
sometimes occasions when the power production from renewable plant exceeds the transmission
capacity that is required to deliver it to the demand centres. This means that there may be occasions
when renewable plant may be required to cease generation, or be ‘constrained off’. The effect of such
constraints will be to increase the costs of the renewable plant, as the capital costs will be spread over
fewer units of electricity than was anticipated. Whether or not these costs are borne by the renewable
generator depends on the structure of the market as designed by the regulator and government.
In Britain, such constraints are likely to occur due to the large quantities of wind energy -- installed or
planned -- in the north of England and Scotland. For many years there have been large North to South
power flows, as generation capacity exceeds demand in the north, and vice versa. There is increasing
concern over the cost of these constraints23, although these can be alleviated by additional
transmission connections at an estimated cost of £ 4,700 million24.
These constraints are not, strictly speaking, a ‘variability’ issue, but more to do with the location of
the best sources of renewable generation, relative to demand. Similar issues arose when the large
14
concentrations of coal-fired power stations were built -- near to the coalfields -- and most significant
expansions of large generating plant involve transmission reinforcements.
4.3 Wind surpluses at high penetration levels
The discussion so far has focused on wind energy penetration levels up to around 40%. In practice, as
noted earlier, higher levels are achievable, albeit at increased cost. A detailed analysis by the Danish
system operator, Energinet, has examined the implications of operating with 100% wind and
quantified the additional costs25. The analysis was carried out for Western Denmark, but ignored the
existence of the connections to Germany, Sweden and Norway and did not assume that any storage
was available.
100% wind is not, of course, feasible but the System Operator assumed that sufficient wind power
capacity was installed in order to meet 100% of the electricity requirements. With that level of
capacity, around 30% of the wind energy had to be rejected when wind power production exceeded
system demand. A similar amount of wind had to be supplied from thermal sources of generation
when the system demand exceeded the wind power production.
The possibility that wind power production may occasionally exceed system demand first occurs at
penetration levels around 25%. Figure 6, which shows actual data from Western Denmark, shows
that it occurred twice during 13/14 January 2007. However, the amounts of ‘surplus’ wind energy are
initially modest and similar estimates come from the Energinet study and from a British study26.
Power demand and output from wind plant, GW
4
3
2
Demand
Wind
1
0
0
10
20
30
40
Time in hours, from 00:00, 13 January 2007
Figure 6. Demand and wind production in Western Denmark, 13/14 January 2007.
With 30% wind energy, the Danish study suggested around 1.7% would need to be constrained off or
rejected and the SKM study a slightly lower level -- although the precise value depended on
assumptions about interconnectors and pumped storage. With 40% wind, both studies projected about
4% would need to be rejected and at 50% wind about 7.5%. Data from the two studies are compared
in figure 7.
If no market can be found for this ‘surplus’ wind energy, a small penalty is attached to this ‘lost’
electricity, as the fixed costs of the wind plant are spread over fewer units of electricity. With 30%
wind, this amounts to around £0.6/MWh of wind, rising to around £1.5/MWh with 40% wind, based
on current installed prices of around £1300/kW. Ways in which this ‘surplus’ may be utilised are
discussed in the section 5.
15
Wind energy surplus, %
15
Energinet
SKM
10
5
0
20
30
40
50
60
Nominal wind energy contribution, %
Figure 7. Estimates of surplus wind energy for contributions up to 60%.
4.3.1 Impact of new nuclear and coal-fired plant
The threshold at which wind energy may need to be rejected, and the corresponding amounts of
surplus wind may change in the future if new nuclear and coal-fired plant is built in Britain. As wind,
nuclear and coal-fired plants are ‘capital intensive’, all need to run as much as possible in order to
repay their capital costs. This is unlikely to be a problem in the short to medium term as the build up
of wind energy is likely to be accompanied by a decline in the capacity of nuclear and coal-fired plant
as the old plants retire and close. If new nuclear and coal-fired plant are given consent and
commissioned, however, then there will possibly be conflicts27 and these are discussed in Appendix 2.
Resolution of these is likely to be a matter for the regulator and government.
4.4 Total costs of variability
The total costs of variability to the electricity consumer -- defined as additional balancing costs, plus
backup costs as discussed in section 4.2, plus constraint costs as discussed in section 4.3 - are shown
in figure 8. The ‘high’ estimate uses National Grid’s upper balancing cost estimate and an installed
cost for combined cycle gas turbine plant (CCGT) of £700/kW in the calculation of backup costs.
The ‘low’ estimate uses National Grid’s lower balancing cost and an installed cost of £500/kW for a
mixture of CCGT and open cycle gas turbine plant. To derive the constraint costs at penetration
levels above 30%, it has been assumed that 12 GW of onshore wind costing £1100/kW has been
installed and 45 GW of offshore wind costing £2000/kW. With 10% wind energy, the extra costs are
below £1/MWh in each case; at the 20% level they rise to a little over £2/MWh in the ‘high’ case
(£1.5/MWh in the ‘low’ case) and with 40% wind, the estimates are £7.3/MWh and £5.2/MWh,
respectively. A ‘central’ figure would add about 5.5% to domestic electricity bills.
Extra cost to consumer, £/MWh
8
6
4
High
Low
2
0
0
10
20
30
40
Wind energy contribution, %
Fi
gure 8. Additional costs associated with variability
16
It must be emphasised that this is the ‘cost of variability’ and the overall extra cost to the consumer
may be greater or less than this figure, depending on the relative generation costs between wind and
gas.
4.5 Types and costs of plant used for reserve
A substantial proportion of the additional reserve is likely to come from thermal plant in the short to
medium term, so changes in fossil fuel prices will influence the cost of reserve and hence the cost of
the additional reserve needed for wind energy. If carbon capture and storage (CCS) on coal and gas-
fired power plant achieves technical and commercial viability, reserve prices are likely to be higher as
their capital costs are higher and their thermal efficiency lower.
Other types of non-fossil generation could, however, provide frequency response and other reserve
services. This could include anaerobic digestion plant, sustainable biomass or biogas.
5. MITIGATING THE EFFECTS OF VARIABILITY
Progress towards 20% -- or even 40% -- wind will inevitably be gradual and so it is highly likely that
technologies and strategies will develop that will mitigate the impacts of variability.
Some of these are already in use, such as improved methods of wind forecasting and this is likely to
have a significant impact. Numerous other ideas are under development or discussion and it is likely
that increased use of demand-side management (possibly aided by the installation of ‘smart meters’)
will also play a key role in reducing variability costs. The use of storage is often advocated, but its
use for ‘levelling the output’ of wind power may be difficult to realise. However, it may have a role to
play -- for the benefit of the electricity network as a whole -- in systems with a high penetration of
variable renewables. The construction of more international transmission links should aid the
assimilation of variable renewables -- and will also work to the benefit of the system as a whole.
Further ahead, the widespread introduction of electric cars or a switch to electric heating would be
beneficial to wind energy, as it would facilitate the absorption of ‘surplus’ wind at times of high wind
and low demand.
Many of the ideas now under discussion for mitigating the extra costs of variability of wind aim to
reduce the additional costs of operating electricity systems with high renewables input, rather than
focusing exclusively on the wind itself. There is a further category of technologies that may come to
fruition for other reasons that may ease the additional costs associated with high wind energy
penetration levels. Table 2 summarises the various possibilities and their likely impacts.
Lower
reserve Higher capacity. Less
Stage
costs
credit
rejection
Wind-related
Better forecasting
Yes
Proven
High offshore productivity Yes
Yes
Likely
System-related
DSM
Yes
Proven
Storage
If price right
Too costly?
If economic
Proven/developing
More international
Probably
Likely
Some building, some
connections
conceptual
Other technologies
Electric cars
Probably
Yes
Developing
Electric space and water
Likely
Feasible
heating
Hydrogen economy
Uncertain
Probably
Conceptual
Table 2. Developments likely to reduce the additional costs of assimilating wind energy.
17
5.1 Wind forecasting
There is considerable work in progress on improvements in wind forecasting and the emergence of
forecasting services, in both Europe and America, testifies to the fact that it is worthwhile improving
the accuracy of projected power outputs. A large EU-funded R&D project involved a large number of
contributors28, and a utility-funded project has been completed in United States, managed by the
Electric Power Research Institute29. Commercial forecasting services are also available, with
software that improves forecasts up to 24 hours ahead. One company claims, for example, that the
error in one-hour-ahead forecasts is typically 15 to 25% lower than that of persistence forecasts30.
Much of this forecasting work is focused on providing services to operators of wind farms, rather than
System Operators, but estimates are available of countrywide improvements that might be expected31.
The analysis, for Germany, suggests that the standard deviation of the uncertainty one hour ahead
might be reduced from 3% to below 2% and, similarly, the 4-hour uncertainty can be reduced from
6% to around 4%. This would reduce the estimates of balancing costs that were quoted earlier by
about 30%, provided the System Operator felt that the forecasting accuracy was sufficiently robust.
5.2 Higher productivity from offshore wind
Most of the analysis in this paper assumes that the weighted average capacity factor of the wind
power plant is around 30%. The latest available figure for onshore wind is 27%50, which may decline
as the better onshore sites are used up; on the other hand this may be more than offset by the higher
productivity of offshore wind. Some of the most recent statistics from Denmark suggest that higher
values are achievable offshore. With a higher capacity factor, the extra balancing costs come down --
as a lower total farm capacity is needed to produce a given output. A 10% increase in the capacity
factor reduces the additional short-term balancing costs by a little over 10% and, by increasing the
capacity credit, reduces the extra back-up costs.
5.3 Demand management
‘Demand-side management’ (DSM) has been an integral part of the load management strategies of
system operators for many years. It has the potential both to reduce peak loads and lower the costs of
reserve. The variable sources of renewable energy, such as wind, are likely to benefit from the wider
adoption of load management in the future, although there are potential benefits for the electricity
system as a whole.
There are various types of demand-side management, although the boundaries are not sharp: -
•
Provision of reserve and frequency response under contract to the System Operator. In
2005/6, users, rather than generators provided about one-third of the ‘standing reserve and
‘frequency response’ balancing service requirements of National Grid32.
•
Teleswitching. This technology has been slowly developing for around 40 years. It enables
demands to be modulated in response to radio signals sent by the System Operator (or, more
usually in the UK, by the Distribution Network Operator). The signals are sent to a special
meter and the technology has the potential to control or modulate interruptible demands.
•
Dynamic demand. Whilst tele-switching is actively (and remotely) controlled, Dynamic
Demand is a passive system that relies on sensors in equipment used by consumers to
modulate demands. If all domestic refrigerators, for example, included a frequency-sensitive
device that inhibited its operation when the frequency fell below (say) 49.8 Hz and switched
the fridge on (provided it was not already too cold) at, say 50.2 Hz, then this could substitute
for between 728 and 1174 MW of frequency response plant33.
18
•
Smart Meters. These give electricity consumers access to information about the price of their
electricity on a continuous basis. The government has announced its intention to facilitate
their introduction on a widespread basis. The most common perception of such meters at
present is to provide information to consumers, rather than intervene to restrict demand on a
selective basis.
•
‘Time of use’ pricing. Smart Meters for domestic consumers, as presently envisaged in
Britain, are a source of usage information and it is up to the consumer whether he responds or
not. ‘Time of use’ tariffs have been in existence for many years in the industrial and
commercial sectors, and, in simplified form, in the domestic sector. The tariffs aim to
discourage use at peak demand times -- that normally coincide with peak prices -- and so iron
out, to some extent, demand fluctuations. If that enables the quantity of rarely used (and
expensive) ‘peaking plant ‘ to be reduced, that reduces both costs and emissions. The most
sophisticated development of ‘time of use’ pricing responds continuously to changes in
market prices. Whether or not consumers can react to high or low prices depends on the type
of electrical equipment they are using. ‘Time of use’ tariffs are common in France and their
effectiveness appears to be reflected in a lower ratio between maximum and minimum
demands. On 21 May 2009, for example, the French ratio was 1.39, whereas in Britain it was
about 1.6.
All these concepts act to improve the efficiency of the electricity system as a whole. Any benefits to
wind would come through reductions in the costs of balancing services. Some benefits are already
being realised (first bullet point) but it is difficult to estimate the magnitude of any additional benefits.
One possible downside (from the point of view of wind) is that a reduction in the uncertainties in the
supply/demand balance might mean that the uncertainties in wind power production would become
more significant, thus increasing additional balancing costs.
5.4 Energy Storage
5.4.1 Dedicated storage
Energy storage is often seen as a means of ‘levelling the output’ variable renewables, possibly
increasing its capacity credit and so increasing its value. Such ‘dedicated storage’ faces a number of
challenges as it adds to the generation cost of the variable renewable. That additional cost needs to be
less than the additional value of ‘firm power’ over variable power. There are additional challenges
with dedicated storage, as the store needs to be very large to ensure that the ‘levelling’ continues
during long periods of low wind.
An early integration study concluded34: --
“There is no operational necessity in associating storage plant with wind-power generation, up to a
wind output capacity of at least 20% of system peak demand"
This does not imply that 20% is a ceiling, or threshold. It was simply the upper limit that was
investigated in the study.
A later American study made the same point35: -
‘Storage may increase the value of intermittent generation. However, studies generally show that
dedicated storage systems for renewables are not viable options for utilities because of added capital
costs of current storage technologies. Storage can add flexibility and value to utility operations, but it
should generally be a system-wide consideration, based on the merit of the storage system’.
19
More recently the American Electric Power Institute suggested36: --
"Installing energy storage….. practically eliminates wind integration issues…. unfortunately the high
cost of storage systems limits the situations in which they are useful."
In Britain, the cost threshold that storage would need to meet for viability in the current market can be
gauged from the difference between ‘continuous’ and ‘variable’ power sources. The difference in the
prices realised for landfill gas (firm power) and for wind energy (variable power) in the auctions
conducted by the Non-Fossil Purchasing Agency is a guide. Between the summer of 2006 and the end
of 2008, the minimum price difference was £1.1/MWh, the maximum £11.2/MWh, and the average
£4.9/MWh. The average roughly corresponds to the theoretical ‘capacity value’, based on the
replacement cost of combined cycle gas turbine plant.
5.4.2 System storage
There is a difference between ‘dedicated storage’ for variable renewables and storage for an
electricity system -- with or without variable renewables. Storage has the potential to enable power
systems to operate more efficiently -- absorbing power at periods of low demand and releasing it at
periods of high demand that otherwise needs to be met by expensive generating plant. This is
generally a less challenging role than ‘dedicated storage’. However, storage has a generation cost, just
like any other generation technology, and will only be economic if the differential between the energy
prices paid to the storage operator at times of high demand, and by the operator for electricity at times
of low demand, is sufficient to cover its costs.
A recent UK Select Committee observed37: -
“No evidence we received persuaded us that advances in storage technology would become available
in time materially to affect the UK’s generating requirements up to 2020.”
A recent analysis that examined the prospects for western Denmark concluded38: -
“The conclusion is that energy storage systems are for most cases uneconomical for day-to-day
trading in Western Denmark.”
If the introduction of large quantities of wind energy into the UK electricity network (and elsewhere)
widens the difference between ‘high’ and ‘low’ spot prices in the electricity market, that may
facilitate the construction of cost-effective storage. Most of the technologies are able provide system
services (short-term operating reserve, reactive power and ‘black start’ capability) and these can
provide additional revenue. There are a number of technologies in existence and under development,
with a wide range of applications, apart from those discussed here39.
5.5 Additional international connections
Additional international connections give system operators access to more sources of power,
effectively increasing the size of the system. The advantages of large systems were discussed in
section 2.1 and perhaps the simplest way of looking at the effects of additional connections is to view
them as additional plant. The ‘effective’ renewable energy penetration level then drops from, say,
30% -- with 80,000 MW of conventional plant -- to, say, 26.7% with 10,000 MW of additional
connections. Reference to figure 6 suggests this brings down the ‘costs of variability’ from around
£4/MWh to £3.2/MWh.
The next stage in the argument for additional interconnections is that, with the two interconnected
systems operated as one, the wind variability comes down. However, the evidence on this point is not
20
clear. On the one hand, the standard deviation of hourly wind fluctuations in Britain is similar to that
in (smaller) Western Denmark (table 1). On the other hand, Foley and Leahy40 combined British and
Irish wind records and showed that the joint occurrence of wind speeds below 5 m/s was reduced to
16% of the time, whereas the individual occurrences were 22% (Britain) and 28% (Ireland).
5.5.1 European Supergrids
A number of proposals for more extensive international grid connections -- mostly using HVDC -
have been put forward in recent years, mostly with some or all of the following objectives: --
•
Facilitating the connection of offshore wind farms.
•
Smoothing wind fluctuations on a continental (rather than national) scale.
•
Facilitating progress towards very high proportions of renewable energy in the European
network including, for example, concentrated solar power plant in Africa.
Hurley et al41 provided data that illustrated the smoothing effects. They took data from 60 well-
distributed sites over a 34-year period and showed, for example, that there were very few occasions
when wind power production fell below 12% of rated output in the winter. This suggests that the
capacity credit of this widely distributed wind might be higher than the values calculated from
individual national studies. Similarly, their analysis of power swings also suggests that there would
be a lower uncertainty, probably leading to lower additional balancing costs.
Decker et al42 have recently summarised most of the proposals that are currently being discussed.
Some cater, in the longer term, for up to 100 GW of offshore wind. They note that increased
interconnections would be beneficial to European electricity networks as a whole, quite apart from
their role in facilitating the connection and smoothing of renewable energy. They also provide data on
the smoothing effects, suggesting that hourly variations in excess of plus or minus 10% appear to be
negligible. (This may be compared with the maximum hourly swings around 14-18% observed in
Western Denmark and estimated for Britain -- see table 1).
A simple cost benefit analysis suggests that significant savings from lower variability costs are needed
to make the concept of European Supergrids attractive. Figure 6 suggested that the additional cost to
the consumer of 40% wind might be just under £6/MWh. If a Supergrid enabled savings of £2/MWh
to be made, then the net present value of these savings over 20 years, with a test discount rate of 10%,
is around £6 billion. The projected costs quoted by Hurley et al., were €9.4 billion – nearly 50%
higher. (Although supergrid construction costs may have increased since the estimate was made).
However, this implicitly suggests that all the extra costs of the Supergrid are debited to wind energy
whereas, in practice, there would be significant system benefits as well. Europe's Transmission
System Operators already have plans for improved interconnections43, most of which are likely to
benefit wind energy.
There are, nevertheless, difficulties on the way to the construction of a European Supergrid. Several
witnesses who appeared before the Energy and Climate Change Select Committee in April/May 2009
drew attention to technical and regulatory difficulties, although there was support for further analysis
of the concept. Another possible difficulty is that national plans for the connection of offshore wind
farms are already well advanced and so the possibility of looking at ‘the big picture’ may already have
passed. Nevertheless, the broad concept has support at the European level, through the ‘Ten E’
programme of support for improved interconnections44.
21
5.6 Electric cars
The prospects for electric cars are being studied with a view to reducing greenhouse gas emissions.
There is a double benefit as air quality in cities will be improved and national emissions will be
reduced, even though the electricity used to charge them at present comes from a mixture that
includes lots of coal and gas-fired plant. The attraction from the standpoint of the electricity industry
is that it may enable the more efficient use of generating plant, provided most of the charging takes
place during the night. Reference to figure 1 shows that between 2230 hrs and 0630 hrs in the winter
the demand dropped below 45,000 MW, whereas during the rest of the day it was above this level,
peaking at just under 60,000 MW. Inspection of data for later in the year (21 May, 2009) suggests that
there was a similar difference between the night time demand and the peak.
A margin of around 15,000 MW would be sufficient to charge the entire fleet of British cars if all
were to be powered electrically (Appendix 3). The additional attraction, from the standpoint of
integrating wind, is that this would enable surplus wind power to be utilised at times when wind
power generation exceeded demand. There would be no guarantee, of course, that surplus wind
would always be generated during the night, but that is a realistic scenario, given the lower demand.
Daytime charging would be possible, provided it could be controlled by some form of ‘smart meter’,
or by teleswitching.
The use of electric cars as a form of storage is also advocated, with electricity being fed back into the
system when needed. The costs and benefits of this option need to be examined as the costs of
reversible circuitry would be higher than those of simple ‘charging’ circuitry -- and the ‘round trip’
efficiency would also be lower. In addition, the System Operator would need to be assured that
sufficient vehicles were likely to be connected during the day -- and vehicle owners would need some
form of control over the process, otherwise there would be a danger of finding that the charge had
been drained when the car was needed. Even if the ‘charging’ option were expensive, that would not
necessarily preclude the System Operator from gaining comparable benefits. Provided that at least
some of the charging load could be reduced, that would ease pressure on the system at times of peak
demand. The beauty of using electric cars as a proxy for storage lies in the fact that the cost of the
storage would not be borne by the electricity system, but by the car owners.
Although much of the discussion surrounding electric cars has focused on their use in high-wind
scenarios, it is likely that they might be to provide reserve services at modest cost. As noted in the
previous paragraph, control of the magnitude of the charging load is a strong possibility, and at
modest cost.
5.7 ‘Smart grids’ and the growth of de-centralised generation
The term ‘Smart Grids’ is used to describe various technologies that may need developed in the future
to enable electricity networks to function more efficiently. Most of these have been covered already,
with the exception of ‘islands’ of decentralised generation. These islands would not necessarily be
permanently disconnected from the main network, but may be able to function independently from
most of the time. A paper45 that was commissioned by the Government Office for Science has
discussed the issues surrounding the concept. The paper suggests, "Fully decentralised energy supply
is not currently possible or even truly desirable", but that, "current evidence points towards the
deployment of an increasingly decentralised energy supply infrastructure, which will still rely on and
benefit from common centralised infrastructures." The rate at which decentralised generation will
grow is somewhat uncertain46, although both PB Power47 and National Grid48 appear to be in broad
agreement that the additional plant capacity will be in the range 3-5 GW by 2020. The present
capacity of embedded generation is around 7500 MW.
22
If self-sufficient decentralised ‘islands’ do become established, this may reduce, slightly, the demand
fluctuations on the network as a whole. This would, however, have a second-order effect on the
estimates of variability costs that have been discussed. The ‘islands’ would, of course, face the same
issues in coping with variable generation if some of their supplies come from such sources.
5.8 Electric space and water heating
At present, electric space and water heating is significantly more expensive than gas or oil-fired
heating. If, however, there were a move towards more electric heating, this potentially would provide
the System Operator with a large source of inexpensive demand-side management. Such a shift in
emphasis might be the result of high fossil fuel prices, government incentives, or both. Electric water
heating, and, to a lesser extent, space heating can be modulated without significantly affecting the
comfort of the consumer, although wider dead bands may be necessary for central heating systems.
The signals that would enable the System Operator to influence demand levels could be transmitted
through ‘smart controls’ or one of the other technologies discussed in section 5.3. The concept is
actively being considered in Denmark49
5.9 The Hydrogen economy
The hydrogen economy has been under discussion for some time but, apart from a few demonstration
plants, has yet to become established. Most studies assume that the prime user of the hydrogen would
be road transport and so its influence on variability costs would be similar to that of electric cars. At
present, however, costs are very uncertain.
5.10 Overall effects
Precise estimates for impacts of the mitigation measures cannot easily be made in every instance. The
prospects for improved methods of wind forecasting are good and allowance for these has already
been incorporated into National Grid's ‘low’ estimate for additional reserve costs. The most
significant impacts would be at the higher levels of wind energy penetration and so Table 3 includes
conservative estimates for 40% wind, based on the assumption that electric cars and/or other demand
side measures are able to offset the constraint costs that occur once wind energy penetration levels
exceed about 20%. It is quite possible, however, that the various measures that have been discussed
will reduce the extra costs at the 20% level by 10% or more.
Case
20% wind 40% wind 40%, mitigated
Lower bound
1.6
5.1
3.8
Upper bound
2.4
7.4
6.1
Table 3. Estimates of variability costs, in £/MWh. With average domestic prices in 200750 being just
over £100/MWh, these also represent percentage additions to consumer bills.
23
6. EXPERIENCE ELSEWHERE
The characteristics of wind tend to be broadly similar the world over and the same applies to
electricity networks -- but there are some differences. Two comprehensive reviews of a large number
of studies, worldwide, showed that the additional reserve costs were very similar, with outlying values
attributable to particular characteristics in the country concerned2,51. The analysis showed that almost
all the estimates of additional reserve costs for 20% wind energy were below £3/MWh. It should be
noted that fuel prices rose after the work was carried out; this influences the costs of frequency
response plant and other operational reserves and so the values quoted in the previous section are now
more relevant.
Wind is poised to become a major contributor to renewable energy targets in most of Europe and
elsewhere. The ‘top five’ contributions expected in Europe range from 40% in Ireland, 33% in
Denmark, 28% in Portugal, to 25% in Germany and Greece52. This suggests that assimilation of wind
is not regarded as a serious problem.
6.1 Germany
With around 25,000 MW of wind installed, Germany come second to United States in terms of
installed capacity, although the contribution to electricity consumption in 2008 was only around 6%.
Some problems have been reported53, leading some observers to assume that difficulties there reflect
universal problems, but this is not the case. This is due partly to the way that the electricity network is
operated, partly to the lower wind speeds that prevail there. In Germany, as well as in some other
electricity jurisdictions, wind tends to be treated in the same way as gas or coal-fired plant and is
required to forecast its output several hours ahead. If the plant schedules lack flexibility, it is quite
likely that the actual output from the wind plant will differ from the commitment made, say, 24 hours
ahead. That may mean that balancing power must be purchased to make up any power deficits or,
alternatively, surplus wind may need to be sold for a low price. The more flexibility that is built into
plant scheduling, the more efficiently can the system the operated.
The other reason why balancing costs for wind in Germany tends to be higher than elsewhere is that
wind speeds are quite low. The average capacity factor of German wind is about 18%, which
compares with 25% in Denmark and 30% in Britain. This means that the wind plant capacity needed
to generate a given amount of energy in Germany is almost twice the capacity needed in Britain. The
magnitude of the power swings from the plant will therefore be higher than those in Britain, and the
additional uncertainty means that the system operator needs to schedule more reserve. The lower
capacity factor means that the additional balancing costs associated with 5% wind energy penetration
are around three times higher in Germany, compared with Britain54.
Low capacity credits are also reported for Germany, but these tend to be system-specific. The capacity
credit of German wind is low -- in percentage terms -- largely because the capacity factor is low, as
noted above.
Nevertheless the German Transmission System Operators have examined the implications of operating their
networks with up to 54 GW of wind by 202055. The corresponding energy penetration level is not quoted in the
report, and is estimated as around 15%.
24
6.2 Denmark
Denmark has, for many years, promoted decentralised electricity, particularly wind power and CHP.
In 2007, wind energy accounted for around 26% of the electricity consumption in western Denmark. It
is sometimes argued that this is a misleading statistic, as western Denmark has transmission links with
Germany, Sweden and Norway and the power exported over these links often mirrors the wind energy
production. The capacity of these links is 2900 MW, slightly less than the installed capacity of the
thermal plant. Roughly speaking, therefore, the plant capacity available to the System Operator is
almost doubled due to the existence of the links and so it could be argued that the ‘effective’ wind
energy penetration level is halved -- to about 13%. This is still higher than anywhere else in the
world.
The System Operator has made a number of estimates of the ‘costs of variability’; the study that
ignored the existence of the transmission links suggested that the extra cost to the electricity consumer
of absorbing 50% wind was about €6/MWh25, which is very close to the estimates for the GB system.
Although wind power growth in Denmark has slowed recently, it is not halting though and plans to
increase its wind energy penetration level to 50% by 202556. It is envisaged that electric vehicles and
heat pumps will absorb wind power surpluses57 and that demand-side response will be a crucial
feature of the electricity system in the future. It is assumed that electric vehicles constitute 15% of
the traffic.
7. CONCLUSIONS
This paper draws on only a small fraction of the references that were cited in two major literature
reviews (the Carbon Trust/DTI ‘Renewables Network Impacts Study’58 and the UKERC study2). More
information has been published since these reports were completed, and reinforces the conclusions
that were drawn. Wind energy, worldwide, continues to grow at around 25% per annum, despite the
recession, which suggests that utilities and governments see it as a reliable source of carbon-free
electricity generation.
There are no significant barriers to the introduction of wind energy due to its variability, and
contributions up to 40% or more of electricity consumption can be managed with quantifiable -- and
modest -- ‘variability costs’. Any study of the impacts of variability needs to take into account the
characteristics of the electricity network within which wind plant operates. Thermal plant
breakdowns generally pose more of a threat to the stability of electricity networks than the relatively
benign variations in the output of wind plant. Aggregation of wind outputs over the whole country
ensures that the fluctuations are smoothed, in exactly the same way as the demands from consumers.
The key parameter that determines the requirements for additional short-term reserves (‘extra
balancing’) is the additional uncertainty in the electricity supply and demand balance. Contrary to
popular perception, wind variations are not totally random and unpredictable and the likely changes in
output, on various timescales, can be quantified. When the uncertainty linked to wind fluctuations is
combined with the underlying uncertainties associated with the thermal plant breakdowns and with
consumer demands, then the requirements for extra balancing, and the additional costs, can be
derived. The costs of additional reserve in Great Britain amount to around £4/MWh of wind for 20%
wind, which adds about 6% to its generation cost. The total costs of variability to the electricity
consumer amount to around £2/MWh at this penetration level which would add about 2% to domestic
electricity bills are. The latter figure takes into account the ‘extra backup costs’. Again, contrary to
popular perception, the latter are quite modest as there is a very large and robust body of evidence that
points to the fact that wind can displace thermal plant, although not on a megawatt for megawatt
25
basis. This issue tends to attract more interest than it deserves, but it is noted that the amount of
‘backup’ plant for the system a whole will always be greater than the capacity contribution expected
from wind energy. Despite low winds during the cold winter of 2008/9 -- and a shortage of nuclear
plant - the system demand was still met. There does not appear to be any firm statistical evidence that
contradicts the large body of analysis on the capacity contribution to be expected from wind energy.
Penetration levels above 20% are quite feasible; although there is a danger of wind that wind will
compete with nuclear and coal plant (with carbon capture and storage) for ‘must run’ status if these
thermal plant types are sanctioned for construction. (Both types of thermal plants are capital-
intensive and so need to run as often as possible to recoup their fixed costs). The additional costs to
the consumer of 40% wind are likely to apply in the range £5-7/MWh; and even at the high end of this
range the additional cost to the domestic electricity consumer would be around 6%.
These additional ‘variability costs’ are likely to fall for a number of reasons, some associated with the
wind itself (such as better forecasting), others associated with efforts to improve the efficiency and
economy of the electricity network. Further implementation of demand side management is likely as
there are several possibilities, some existing, and some emerging. Passive methods, such as ‘dynamic
demand’ are attractive and possibly low-cost. (This technology envisages frequency-sensitive sensors
within plugs or appliances that increase or reduce demand, depending on system frequency).
Additional international connections -- already under discussion -- will also aid the assimilation of
wind as well as facilitating more efficient operation of the electricity network. The most advanced of
these concepts -- ‘European supergrids’ -- envisages sufficient additional connections to enable most
of Europe's electricity supplies to be provided by renewable sources. Finally, other technical
developments, unrelated to wind energy, may result in a lowering of variability costs, the
development of electric cars and a possible shift towards electric space and water heating.
26
APPENDIX 1. Capacity Credit
The most rigorous method of calculation for capacity credit involves examining the loss of load
probability for electricity system over a period of at least a year. The integrated value over this period
is the ‘the loss of load expectation’. When wind is added to the electricity system, more power is
available and so the loss of load expectation is reduced. Conventional plant may therefore be
notionally removed from the system to restore the original loss of load expectation. The capacity of
this conventional plant, divided by the rated capacity of the wind plant is the capacity credit.
It may be apparent from this description that capacity credits are not universal but most studies that
have been carried out for the British system suggest that the capacity credit at low levels of wind
energy penetration is roughly equal to the ‘winter quarter’ capacity factor. It declines, in percentage
terms, as the amount of wind energy increases but continues to increase in megawatt terms. There is a
‘saturation’ level that is probably around 7500 MW.
Figure 9 shows that four independent studies have reached very similar conclusions as to how the
capacity credit declines with increased wind energy penetration. The capacity credits have been
normalised with respect to the capacity factor. With 10% wind, for example, the ratio is about 0.8. If
the average capacity factor of the wind plant is 0.3, then the capacity credit is 0.24. So 12,000 MW of
wind would displace 0.24*12,000, or 2880 MW, of thermal plant.
Capacity credit/annual capacity factor
1.6
1.4
1.2
1
NGC
0.8
SCAR
CEGB
0.6
Shakoor & Strbac
0.4
0.2
0
0
10
20
30
40
50
Wind energy contribution, %
Figure 9. Capacity credits for the British system, derived from four independent studies, by NGC59,
the ‘SCAR’ report12, the CEGB60, and Shakoor and Strbac61. The capacity credits have been
normalised with respect to the capacity factor to eliminate apparent distortions resulting from the
differing assumptions about capacity factor. With 20% wind (for example) the ratio (from the graph)
is about 0.55. If the capacity factor is 0.35, then the capacity credit is 0.192. 20% wind corresponds
to about 26,000 MW and so the corresponding capacity credit is 5000 MW.
It is often suggested that large, high-pressure weather systems may prevent wind generation over the
whole of Great Britain during times of peak demand. This, it is argued, means that substantial
amounts of backup are required to replace the ‘missing’ wind generation.
There are several weaknesses in this hypothesis: --
1. System Operators do not rely on the full rated output of any plant being available at peak
times. The expected contribution is quantified by the ‘firm power’. With nuclear plant, for
example, the average availability at times of peak demand is around 85% of its rated output.
On some occasions it will be less, on other occasions, more. For wind, 10,000 MW of wind in
the UK has a capacity credit of about 3,300 MW, so the ‘firm power’ equivalent is about
2,800 MW. On average, roughly that amount of wind will be available at times of peak
27
demand. On some occasions it will be less, on others will be more. This is no different from
the approach to the capacity credit of nuclear plant.
2. There does not appear to be any evidence that the whole country is regularly becalmed at
times of peak demand. On the contrary, work carried out at the University of East Anglia62
suggested: “…peak demand times occur when cold weather is compounded by a wind chill
factor, and low temperature alone appears insufficient to produce the highest demand of the
year”. Other work at Oxford University yielded similar conclusions63: - "There is an
increased probability of high wind power output.... during periods of high electricity demand;
this translates into a capacity factor during peak electricity demand hours that is around one-
third higher than the annual average."
Numerous studies have shown that, statistically, wind can be expected to contribute to peak demands.
The evidence is very robust and there are several approaches: -
1. The statistical approach64. This assumes winds are random in nature, with respect to
electricity demand. Analysis has confirmed that this is the case.
2. Analyses of wind turbine output. Work at the University of East Anglia, cited above, is very
relevant. Using just four sites, they showed that the summed average wind turbine outputs
during 8 winter peak demands was about 32% of rated output. National Wind Power,
similarly have found that “wind farm capacity factors during periods of peak demand are
typically 50% higher than average all-year capacity factors”65.
3. Power system simulations. These include those of the CEGB60 and more recent work by
National Grid Transco.
The UK studies have all yielded similar results, pointing to wind having a capacity credit roughly
equal to the ‘winter quarter’ capacity factor, (around 30-40%) at low penetrations. Thereafter, it
decreases, reaching around 20% with 20% wind on the network, as shown in figure 9. Increased use
of offshore wind, with higher wind speeds and greater geographical diversity, is likely to increase the
firm power contribution.
APPENDIX 2. Conflicts between Wind and Large Conventional Thermal Baseload
Plant
Nuclear, wind and coal fired plant (especially coal with carbon capture and storage) are all ‘capital
intensive’; in other words the need to repay their capital costs (with interest) has a strong influence on
their generation prices. Around 50-75% of the generation price is due to capital costs. Operators of
these plants therefore aim to run whenever possible so as to spread these costs over as many units of
electricity as possible, thus minimising prices. If output needs to be constrained, the price of
electricity needs to increase, whereas if conventional gas or coal plant is constrained, fuel costs are
avoided and the impact on electricity prices is less.
Noting that the minimum demand on the British electricity system is about 22 GW66 it is possible to
make sixth you are first order estimates of the way that constraints may be incurred. If there were no
other capital-intensive plant on the network, then wind energy would need to be constrained once its
output exceeded this level. Experience from Western Denmark shows that it is extremely rare for the
wind output to exceed about 80% of its rated capacity. So, in theory, wind energy may need to be
constrained once its capacity exceeds about 22/0.8, or 27.5 GW. This corresponds to an energy
penetration level of about 20%.
28
As the penetration level of capital-intensive thermal plant rises, it is likely that some would need to be
constrained off at times of low demand, and there would be no ‘room’ for any wind. With a load
factor for thermal plant of 85%, the corresponding critical level of capacity would then be about 26
GW. This corresponds to an energy penetration level around 48%.
% Wind generation
50
40
30
20
10
0
0
10
20
30
40
50
Generation from thermal plant, %
Figure 10. Indicative estimates of possible conflicts between wind and capital-intensive thermal
plant. Above the line constraints are likely to occur and below the line they are not.
Figure 10 illustrates how capital-intensive thermal plant and wind may come into conflict. With no
capital-intensive thermal plant, then, as outlined above wind can build up to about the 20% level
without any constraints. With a 20% contribution from capital-intensive thermal plant, however, then
with a wind contribution greater than about 10%, some constraints (one or the other) are likely to
occur. Any capital-intensive thermal plant contribution over about 40% is likely to lead to constraints
of either or both technologies.
This first-order assessment of the constraint boundaries does not identify the volume of constraints
and this issue is discussed in more detail in section 4.3.
APPENDIX 3: Electric Cars
This appendix sets out the arithmetic that led to the estimate for the electricity requirement for electric
cars.
Unit
Amount
Current fuel consumption, cars and taxis67.
Mtoe
17
A
Energy content of fuel50
TWh/Mtoe
12.7
B
Total energy use
TWh
216
c = a*b
Overall efficiency of cars
%
15
D
Net energy requirement
TWh
32
e = c*d
Electric vehicle efficiency (Power station to road) %
70
F
Electricity requirement, all cars and taxis
TWh
46
g = e/f
Corresponding average power need (continuous)
MW
5250
h = g/8760
Power need if all charged in 8 hours
MW
16750
i = h*3
Power need per car (28 million)
kW
0.6
j = i/28E6
The power need per car has been derived to check that the demand can be met on domestic circuits,
without modification. 0.6 kW is well within the capabilities of domestic circuits. In practice, electric
cars would properly be charged at around 2.5 kW, but not all would require charging every night.
29
APPENDIX 4. Glossary
Backup: spare generating plant, carried by all electricity networks, to ensure that peak demands
always met, despite plant breakdowns.
Balancing costs: costs paid by the System Operator to owners of plant providing Operational Reserve
(qv). In line with common practice, the extra costs for wind are generally expressed per MWh of wind
generated.
Black start: power plant that has the ability to restart without needing a grid connection. This type of
plant is necessary to ensure that electricity generation can resume after an incident that causes
disconnection of large quantities of electricity demand.
Constraints: restrictions that may be imposed on power stations or wind farms, curtailing their
output, due to a lack of transmission capacity or a potential surplus of generation over demand.
Demand-side management: provision of operational reserve to the System Operator by modulation
of demands. It is also used to modulate system demand and customers generally receive favourable
tariffs in return for agreements to reduce demands.
Frequency response (plant): see section 2.2.1
Operational reserve: a quantity of generating plant that is kept in readiness to deal with short-term
mismatches between supply and demand. A description of the various categories is in section 2.2 .1
Plant margin: the magnitude (in MW) of backup plant (qv), over and above the expected peak
demand of the electricity network. In UK expressed as a percentage of the peak demand.
Short term operational reserve: This is the term preferred by National Grid for ‘ operational
reserve’.
System operator: the entity that is responsible for operating a power system
Trip(s): a sudden loss of generation by thermal power stations, due to mechanical, electrical or
electronic faults.
Thermal power stations: power stations that use gas, nuclear, oil or coal as fuel.
Variability costs: see discussion at the beginning of section 4.
30
REFERENCES
1 HM Government, 2008. Energy markets outlook report. The Stationery Office, London. HC91
2 Gross, R, Heptonstall, P, Anderson, D, Green, T, Leach, M and Skea, J, 2006. The costs and
impacts of intermittency. UK Energy Research Centre, London.
3 Based on data from Energy Information Administration, US Department of Energy.
http://www.eia.doe.gov/
4 Ofgem, 2004. National Grid System Operator Incentive scheme from April 2005.
5 National Grid Company plc, 2001. Market development: response prices and curves.
6 House of Lords, Select Committee on Economic Affairs, 2008. 4th Report of Session 2007–08. The
Economics of Renewable Energy. The Stationery Office Ltd, London
7 National Grid, 2008. Report of the investigation into the automatic demand disconnection
following multiple generation losses and the demand control response that occurred on the 27th
May 2008.
8 Ofgem, 2008. National Grid Electricity Transmission System Operator Incentives from 1 April
2008.
9 Davies E. (Ed). Modern Power Station Practice, Volume L, System Operation. Pergamon Press,
Oxford, 1991.
10 Milborrow, D, 2001, PIU Working Paper on Penalties for Intermittent Sources of Energy.
http://www.cabinetoffice.gov.uk/strategy/work_areas/energy/background.aspx
11 NGC, 2001. Submission to Energy Policy Review, Appendix 2
12 Ilex Energy Consulting Ltd and UMIST, 2002, Quantifying the system costs of additional
renewables in 2020. Report to the DTI. http://www.berr.gov.uk/files/file21352.pdf, accessed
29.4.09
13 National Grid UK, 2004. Seven Year Statement. www.nationalgrid.com/uk/
14 Milborrow, D, 2009. Quantifying the impacts of wind variability. Proceedings of the Institution of
Civil Engineers. Energy. Paper accepted for publication.
15 Hirst, E, 2001. Interactions of wind farms with bulk-power operations and markets. Prepared for
Sustainable FERC Energy Policy, Virginia.
16 National Grid UK, 2008. Seven Year Statement. www.nationalgrid.com/uk/
17 National Grid plc, 2008. Evidence to House of Lords European Union Committee, 27th Report,
Session 2007-08. "The EU’s target for renewable energy: 20% by 2020.” Report HL 175-II
18 DeMeo, E, Jordan, G, Kalich, C, King, J, Milligan, M, Murley, C, Oakleaf, B and Schuerger, J,
2007. Accommodating wind’s natural behaviour. IEEE Power and Energy Magazine,
November/December
19 EoN UK, 2008. Requirement for thermal generation to back-up wind capacity. Evidence submitted
to House of Lords Economic Affairs Committee into the Economics of Renewables. HL Paper
195. The Stationery office, London.
20 Milborrow, D, 2009. Is wind reliable? New Power UK, issue 1
21 British Wind Energy Association, 1982. Wind energy for the eighties. Peter Peregrinus Ltd,
Stevenage.
22 Dale, L, Milborrow, D, Slark, R and Strbac, G, 2004. Total cost estimates for large-scale wind
scenarios in UK. Energy Policy, 32, 1949-56.
23 Ofgem, 2009. "Managing constraints on the GB transmission system", open letter from Ofgem to
National Grid, 17 February.
24 Electricity Networks Strategy Group, 2009, Our Electricity Transmission Network: a Vision for
2020. http://www.ensg.gov.uk/assets/1696-01-ensg_vision2020.pdf
25 Pedersen, J, Eriksen, P and Orths, A, 2006. Market impacts of large-scale system integration of
wind power. European Wind Energy Association Conference, Athens. European Wind Energy
Association.
31
26 Sinclair Knight Merz, 2008. Growth scenarios for UK renewables generation and implications for
future developments and operation of electricity networks. BERR Publication URN 08/121.
27 Milborrow, D, 2006. The technical and economic conflicts. Windpower Monthly, 22, 6, 64.
28 Kariniotakis, G et al (29 authors), 2003. ANEMOS: development of a next generation wind power
forecasting system for the large-scale integration of onshore and offshore wind farms. European
Wind Energy Conference, Madrid.
29 “Wind generation forecasting for power dispatching” EPRI Journal online, May 2003.
30 Web site: http://www.awstruewind.com/
31 Wessel, A, Jiang, J and Dobschinski, J, 2009. Improving short-term forecasting with online wind
measurements. European Wind Energy Conference, Marseille. European Wind Energy
Association.
32 Perkins, J, 2006. Demand side participation in balancing services.
http://www.nationalgrid.com/NR/rdonlyres/. Accessed 18.5.09
33 Department of Energy and Climate Change, 2008. The potential for dynamic demand. URN
08/1453.
34 Farmer, E D, Newman, V G and Ashmole, P H, 1980, Economic and operational implications of a
complex of wind-driven power generators on a power system. IEE Proc A, 127, 5
35 Wan, Y and Parsons, B, 1993. Factors Relevant to Utility Integration of Intermittent Renewable
Technologies. National Renewable Energy Laboratory, NREL/TP-463-4953.
36 Douglas, J, 2006. Putting wind on the grid. EPRI Journal, Spring.
37 House of Lords, Select Committee on Economic Affairs, 2008. The Economics of Renewable
Energy. 4th Report of Session 2007–08, HL Paper 195–I. London : The Stationery Office Limited
38 Greiner, C, Korpas, M and Gjengedal, T, 2009, Optimal Operation of Energy Storage Systems
Combined with Wind Power in Short-Term Power Markets. European Wind Energy Conference,
Marseille. European Wind Energy Association.
39 Electric Power research Institute, 2008. Emerging technologies to increase the penetration and
availability of renewables. www.epri.com
40 Foley, A, Leahy, P and McKeogh, E, 2009. Wind Energy Variability, the Wales-Ireland
Interconnector and Storage – the Proceedings of the IEEE PES/IAS Conference on Sustainable
Alternative Energy at Instituto de Ingeniería Energética, Universidad Politécnica de Valencia,
Spain, 28-30 September.
41 Hurley, B, Hughes, P and Giebel, G, 2007. Reliable power, wind variability and offshore groups in
Europe. In : Boyle, G (Ed), Renewable electricity and the grid: the challenge of variability.
Earthscan, London.
42 De Decker, J, Vu Van, T and Woyte, A, 2009. The Greenpeace offshore grid report: development
drivers and benefits. European Wind Energy Conference, Marseille. European Wind Energy
Association.
43 Union for the Coordination of the Transmission of Electricity (UCTE), 2009. UCTE Transmission
Development Plan. UCTE, Brussels. http://www.ucte.org/
44 http://ec.europa.eu/ten/energy/documentation/doc/2008_05_20_eib_presentation_en.pdf
45 Bouffard, F and Kirschen, D, 2008. Centralised and distributed electricity systems. Energy Policy,
36, 4504-4508.
46 Ofgem, 2009. Electricity Distribution Price Control Review: Methodology and Initial Results
Paper. Ofgem 47/09.
47 PB Power, 2008. The PB Powerreport on future network architectures. BERR, file 46168.
48 National Grid Briefing Note. "Gone Green" a scenario for 2020.
49 Elkraft System, 2005. Long-term challenges in the electricity system. [Elkraft was the system
operator in eastern Denmark and is now merged with Energinet]
50 Department for Business Enterprise and Regulatory Reform, 2008. Digest of United Kingdom
Energy Statistics 2008.
51 International Energy Agency, 2005. Variability of wind power and other renewables: management
options and strategies. International Energy Agency, Paris.
32
52 Rajgor, G, 2009. Achieving 12-15% electricity from wind power. Windpower Monthly (March)
special report: Europe 2020. Haymarket Business Media, London.
53 E.oN Netz, 2005. Wind report 2005. Formerly available at http://www.eon-netz.com/, but no
longer appears to be there.
54 Milborrow, D, 2007. Wind power on the grid. In : Boyle, G (Ed), Renewable electricity and the
grid: the challenge of variability. Earthscan, London.
55 Consortium DEWI/E.ON Netz /EWI/RWE Transport Grid, Electricity VE Transmission, 2005.
Planning of the Grid Integration of Wind Energy in Germany Onshore and Offshore up to the Year
2020. http://www.dena.de/
56 Ea Energy Analyses, 2007. 50% Wind Power in Denmark in 2025. Available at www.energinet.dk
57 Energinet, 2009. Efficient use of wind power-based electricity in Denmark – interaction between
wind power, heat pumps and electric vehicles.
http://www.energinet.dk/……../heat_pumps_and_electric_vehicles_Resume_UK.pdf
58 Mott MacDoald Ltd, 2003. The Carbon Trust & DTI Renewables Network Impact Study
Annex 4: Intermittency Literature Survey & Roadmap
59 Dale, L, 2002. “Managing intermittency in renewable energy". Workshop on “Managing
Intermittency in Renewable Energy”. London, 29 November. Environmental Climate Change
Institute, Oxford.
60 Holt, J S, Milborrow, D J And Thorpe, A, 1990. Assessment of the impact of wind energy on the
CEGB system. Report for the European Commission.
61 Shakoor, A and Strbac, G, 2004. Impact of intermittent renewable generation on system security.
IEE Professional Networks on Power Trading and Control. http://
theiet.org/oncomms/powertrading./. Accessed 29.4.09
62 Palutikof, J, Cook, H and Davies, T, 1990. Effects of geographical dispersion on wind turbine
performance in England: a simulation. Atmospheric Environment, Vol 24A, No 1.
63 Sinden, G, 2007. Characteristics of the UK wind resource: long-term patterns and relationship to
electricity demand. Energy Policy, 35, 1, Pages 112-127.
64 Swift-Hook, D T, 1987. Firm power from the wind. Proceedings of the 1987 British Wind Energy
Association Conference, Edinburgh. Mechanical Engineering Publications Ltd, London.
65 Warren, J, Hannah, P, Hoskin, R, Lindley, D and Musgrove, P, 1995. Performance of wind farms
in complex terrain. Proceedings of the 1995 British Wind Energy Association Conference,
Warwick. Mechanical Engineering Publications Ltd, London.
66 National Grid, 2009. Seven Year Statement. http://www.nationalgrid.com/uk/sys_09
67 Department for Transport, 2008. Transport Statistics Great Britain.
33