Original PDF Flash format darien-fire-department  


Darien Fire Department

Darien Fire Department
Squad 2360 Monthly Inspection Log
Last Revised 03/12/2009 Form 23.5.5

Darien Fire Department
Squad 2360 Monthly Inspection Log
Truck color code: Black

Each item must be checked for proper condition, operation, and marking before being checked
off. Any changes in quantities must be noted.

Inventory, Exterior:

Compartment #1

Generator:



____ Hydraulic Fluid Level - ATF Dexron II



____ All circuit breakers off

____ 1 Grounding spike and cable

____ 1 Driving hammer

Compartment #2

Top shelf

____ Bar and chain oil

____ 2 Cycle oil


Middle shelf

____ 1 STIHL 290 chain saw


____ Bar and chain oil level


____ Blade


____ Run for minimum of 1 minute.


____ Refill fuel to full - 2 cycle oil and gas mix

____ 1 Tool box, hand tools

____ 1 Tool box, spare chains


Bottom shelf

____ 1 ECHO QV- 8000 vent saw


____ Bar and chain oil level


____ Blade


____ Run for minimum of 1 min.


____ Refill fuel to full - 2 cycle oil and gas mix




____ 1 STIHL TS - 400 Rotary saw 14”


____ Blade (replacement blades in rear crew cab)


____ Run for minimum of 1 min.


____ Refill fuel to full - 2 cycle oil and gas mix

____ 1 1 ½ gallon plastic gas can, 2 cycle mix


____ Level
Form 23.5.5
Page 1


Darien Fire Department
Squad 2360 Monthly Inspection Log
Last Revised 03/12/2009 Form 23.5.5


____ 1 5 gallon plastic gas can - straight gasoline


____ Level

Compartment #3

____ 6 Bags Oil - Dri

____ 2 Feed shovels

____ 1 Blow gun attached to air hose

____ 1 Wheel chock (underneath compartment)


Compartment #4

Top shelf

____ 1 25’ ext. cord

____ 1 50’ ext. cord

____ 1 2’ 1 into 3

____ 3 Misc utility rope


Middle shelf

____ 1 100’ ext. cord, 1 into 3

____ 1 Tarp, yellow

____ 1 Tarp, green

____ RIT air pack


____ SCBA tank full

____ 2 RIT tool bags:


____ 1 36” Halligan


____ 1 Sledge hammer, short handle


____ 2 Splitting maul


____ 2 Pick point axe


Bottom shelf

____ 1 36’ Halligan tool

____ 1 42’ Halligan tool

____ 1 Denver tool

____ 4 Pick - Point axes

____ 2 Flat head axes

____ 2 10lb Sledge hammer

____ 1 Bolt cutters

____ 4 3’ pike pole

____ 3 Flat bars

____ 1 Cable come- a - long w/ handle

____ 1 Crow bar

____ 1 Duct tape

Compartment #5
Form 23.5.5
Page 2


Darien Fire Department
Squad 2360 Monthly Inspection Log
Last Revised 03/12/2009 Form 23.5.5


____ All hydraulic fittings on tools or hoses must be capped or connected to


avoid contamination of hydraulic system.

____ 1 Hurst 120V hydraulic power unit, on sliding tray


____ Hydraulic oil level (use Hurst hydraulic fluid only)


____ Pre - connected to 100’ orange hydraulic hose reel

____ 1 Hurst JL - 32a spreaders, on slide out shelf


____ 2 Standard spreader tips, 32a


____ 2 Aircraft spreader tips, 32a


____ 2 Hurst chain shackle attachment, 32a


____ 2 Hurst spreader chains, 32a

____ 1 Hurst JL - 150 cutters

____ 1 Hurst medium ram - 30’

____ 1 Hurst ram accessory kit

____ 1 30’ blue Hurst hydraulic hose

____ 1 30’ orange Hurst hydraulic hose

____ 1 30’ green Hurst hydraulic hose

____ 1 Hurst multi - tool manifold w/ dump valve


____ pre - connected to hydraulic hose reel

____ 1 Pry - axe w/ extra pry blade

____ 1 Battery cable cutter

____ 1 Window punch

____ 1 Wheel chock (underneath compartment)


Transverse Compartment (located in the bottom of compartments #5 & #6)

____ 2 D - Handle pike pole

____ 1 Pike pole

____ 1 Stokes basket

____ 2 “Emergency scene ahead” signs w/ bases

____ 1 Hi-lift jack

____ 4 poles for stop / slow paddle signs

Rear Exterior

____ 2 Floodlights with tripod stands

Compartment #6

____ All hydraulic fittings on tools or hoses must be capped or connected to


avoid contamination of hydraulic system

____ 1 Hurst gasoline hydraulic power unit, on sliding tray


____ Pre- connected to 100’ blue hydraulic hose reel


____ Engine oil level - 10W30


____ Hydraulic fluid level - use Hurst hydraulic fluid only


____ Run for minimum of 1 minute


____ Fuel tank filled after running - straight gasoline only
Form 23.5.5
Page 3


Darien Fire Department
Squad 2360 Monthly Inspection Log
Last Revised 03/12/2009 Form 23.5.5


____ 1 Hurst 24a spreader, on sliding shelf

____ 1 Hurst JL-150 Cutter

____ 2 Hurst JL-30 rams

____ 2 30’ orange Hurst hydraulic hose

____ Gas can - straight gasoline


____ Level

____ 1 Yellow toolbox w/ Hurst hydraulic fluid

____ 1 Hurst multi - tool manifold w/ dump valve

____ 1 Wheel chock (underneath compartment)

Compartment #7: Cascade air fill system

Record psi. in each tank:



Tank 1 ______



Tank 2 ______



Tank 3 ______



Tank 4 ______



Tank 5 ______



Tank 6 ______

____ 8 SCBA Scott air tanks


____ Each SCBA tank level checked (Must be full)

____ 3 MSA yellow air tanks


____ Each tank level checked (Must be full)

____ 1 Air chisel w/ hose attached to box

____ 1 Adjustable wrench


Compartment # 8

____ 1 Fragmentation container

____ 1 Blow gun attached to air hose

____ 1 Wheel chock (underneath compartment)


Compartment # 9

Middle shelf

____ 1 Hurst air bag control center, yellow case

____ 1 Black bag, containing:


____ 1 Yellow air bag fill hose


____ 1 Blue air bag fill hose


____ 1 Red air bag fill hose

____ 1 HK - 9 ton air bag

____ 1 HK - 21 ton air bag

____ 1 HK - 26 ton air bag

____ 5 airbag cribbing boards


Form 23.5.5
Page 4


Darien Fire Department
Squad 2360 Monthly Inspection Log
Last Revised 03/12/2009 Form 23.5.5




Bottom shelf

____ Cribbing


____ 2 Step chocks


____ 4 X 4’s


____ Wedges


Compartment # 10

____ 2 Electric negative pressure fan

____ 1 Quick grip bar

____ 1 Gas PPV fan


____ Engine oil level - 10w30 oil


____ Run fan for minimum of 1 minute


____ Fill fuel level to full (use gasoline found in comp. #2)

Interior crew compartment

____ 4 Orange Fire Vulcan flashlights on charger

____ 17 Traffic cones

____ 5 Rotary saw blades

Broom compartment

____ 3 Broom handles

____ 3 Broom heads

Cabinet #1

____ 4 boxes barricade tape

____ 2 MSDS books

____ 2 Phone books

SCBA rack

____ 4 Scott SCBA racks w/ bottles


____ SCBA tank full


____ Little ED angle head flashlight on left shoulder strap

Cabinet #2


Top Shelf

____ 4 Stop / Slow paddle signs

____ 2 Extrication blankets

Bottom shelf

____ 1 Sawzall in case w/ charger


____ batteries fully charged

____ 8 LED Turbo Flares in case w/ screwdriver
Form 23.5.5
Page 5


Darien Fire Department
Squad 2360 Monthly Inspection Log
Last Revised 03/12/2009 Form 23.5.5


Cabinet #3

Middle shelf

____ 1 12v charger cord for TIC

____ 1 Hood for TIC



Bottom shelf

____ 1 Thermal Imaging Camera on charger

SCBA tank rack

____ 4 Scott SCBA racks w/ bottles


____ SCBA tank full


____ Little ED angle head flashlight on left shoulder strap


Cabinet #4

Top shelf

____ 1 Haz Mat gear bag, blue


____ 4 Hard hats


____ 2 Coveralls, brown


____ 4 Tyvek suits, white


____ 4 Gloves, black


____ 4 Boots, yellow


____ 1 Yellow Chem tape

____ 3 Full face respirators in bag, black


____ 1 Face piece


____ 2 Large air purifying filters


____ 1 Small air purifying filter


Middle shelf

____ 1 SCBA mask wipes, box

____ 1 First aid kit


Bottom shelf

____ Misc bottled water or Gatorade

Command desk

____ 1 Cell phone w/ charger

____ 1 MABAS portable radio

____ 2 UHF portable radio

____ 1 Operations orange book

____ 1 Clipboard w/ run reports and pens

Signature:







Date:
Form 23.5.5
Page 6


Darien Fire Department
Squad 2360 Monthly Inspection Log
Last Revised 03/12/2009 Form 23.5.5




Form 23.5.5
Page 7