Darien Fire Department
Darien Fire Department
Squad 2360 Monthly Inspection Log
Last Revised 03/12/2009 Form 23.5.5
Darien Fire Department
Squad 2360 Monthly Inspection Log
Truck color code: Black
Each item must be checked for proper condition, operation, and marking before being checked
off. Any changes in quantities must be noted.
Inventory, Exterior:
Compartment #1
Generator:
____ Hydraulic Fluid Level - ATF Dexron II
____ All circuit breakers off
____ 1 Grounding spike and cable
____ 1 Driving hammer
Compartment #2
Top shelf
____ Bar and chain oil
____ 2 Cycle oil
Middle shelf
____ 1 STIHL 290 chain saw
____ Bar and chain oil level
____ Blade
____ Run for minimum of 1 minute.
____ Refill fuel to full - 2 cycle oil and gas mix
____ 1 Tool box, hand tools
____ 1 Tool box, spare chains
Bottom shelf
____ 1 ECHO QV- 8000 vent saw
____ Bar and chain oil level
____ Blade
____ Run for minimum of 1 min.
____ Refill fuel to full - 2 cycle oil and gas mix
____ 1 STIHL TS - 400 Rotary saw 14”
____ Blade (replacement blades in rear crew cab)
____ Run for minimum of 1 min.
____ Refill fuel to full - 2 cycle oil and gas mix
____ 1 1 ½ gallon plastic gas can, 2 cycle mix
____ Level
Form 23.5.5
Page 1
Darien Fire Department
Squad 2360 Monthly Inspection Log
Last Revised 03/12/2009 Form 23.5.5
____ 1 5 gallon plastic gas can - straight gasoline
____ Level
Compartment #3
____ 6 Bags Oil - Dri
____ 2 Feed shovels
____ 1 Blow gun attached to air hose
____ 1 Wheel chock (underneath compartment)
Compartment #4
Top shelf
____ 1 25’ ext. cord
____ 1 50’ ext. cord
____ 1 2’ 1 into 3
____ 3 Misc utility rope
Middle shelf
____ 1 100’ ext. cord, 1 into 3
____ 1 Tarp, yellow
____ 1 Tarp, green
____ RIT air pack
____ SCBA tank full
____ 2 RIT tool bags:
____ 1 36” Halligan
____ 1 Sledge hammer, short handle
____ 2 Splitting maul
____ 2 Pick point axe
Bottom shelf
____ 1 36’ Halligan tool
____ 1 42’ Halligan tool
____ 1 Denver tool
____ 4 Pick - Point axes
____ 2 Flat head axes
____ 2 10lb Sledge hammer
____ 1 Bolt cutters
____ 4 3’ pike pole
____ 3 Flat bars
____ 1 Cable come- a - long w/ handle
____ 1 Crow bar
____ 1 Duct tape
Compartment #5
Form 23.5.5
Page 2
Darien Fire Department
Squad 2360 Monthly Inspection Log
Last Revised 03/12/2009 Form 23.5.5
____ All hydraulic fittings on tools or hoses must be capped or connected to
avoid contamination of hydraulic system.
____ 1 Hurst 120V hydraulic power unit, on sliding tray
____ Hydraulic oil level (use Hurst hydraulic fluid only)
____ Pre - connected to 100’ orange hydraulic hose reel
____ 1 Hurst JL - 32a spreaders, on slide out shelf
____ 2 Standard spreader tips, 32a
____ 2 Aircraft spreader tips, 32a
____ 2 Hurst chain shackle attachment, 32a
____ 2 Hurst spreader chains, 32a
____ 1 Hurst JL - 150 cutters
____ 1 Hurst medium ram - 30’
____ 1 Hurst ram accessory kit
____ 1 30’ blue Hurst hydraulic hose
____ 1 30’ orange Hurst hydraulic hose
____ 1 30’ green Hurst hydraulic hose
____ 1 Hurst multi - tool manifold w/ dump valve
____ pre - connected to hydraulic hose reel
____ 1 Pry - axe w/ extra pry blade
____ 1 Battery cable cutter
____ 1 Window punch
____ 1 Wheel chock (underneath compartment)
Transverse Compartment (located in the bottom of compartments #5 & #6)
____ 2 D - Handle pike pole
____ 1 Pike pole
____ 1 Stokes basket
____ 2 “Emergency scene ahead” signs w/ bases
____ 1 Hi-lift jack
____ 4 poles for stop / slow paddle signs
Rear Exterior
____ 2 Floodlights with tripod stands
Compartment #6
____ All hydraulic fittings on tools or hoses must be capped or connected to
avoid contamination of hydraulic system
____ 1 Hurst gasoline hydraulic power unit, on sliding tray
____ Pre- connected to 100’ blue hydraulic hose reel
____ Engine oil level - 10W30
____ Hydraulic fluid level - use Hurst hydraulic fluid only
____ Run for minimum of 1 minute
____ Fuel tank filled after running - straight gasoline only
Form 23.5.5
Page 3
Darien Fire Department
Squad 2360 Monthly Inspection Log
Last Revised 03/12/2009 Form 23.5.5
____ 1 Hurst 24a spreader, on sliding shelf
____ 1 Hurst JL-150 Cutter
____ 2 Hurst JL-30 rams
____ 2 30’ orange Hurst hydraulic hose
____ Gas can - straight gasoline
____ Level
____ 1 Yellow toolbox w/ Hurst hydraulic fluid
____ 1 Hurst multi - tool manifold w/ dump valve
____ 1 Wheel chock (underneath compartment)
Compartment #7: Cascade air fill system
Record psi. in each tank:
Tank 1 ______
Tank 2 ______
Tank 3 ______
Tank 4 ______
Tank 5 ______
Tank 6 ______
____ 8 SCBA Scott air tanks
____ Each SCBA tank level checked (Must be full)
____ 3 MSA yellow air tanks
____ Each tank level checked (Must be full)
____ 1 Air chisel w/ hose attached to box
____ 1 Adjustable wrench
Compartment # 8
____ 1 Fragmentation container
____ 1 Blow gun attached to air hose
____ 1 Wheel chock (underneath compartment)
Compartment # 9
Middle shelf
____ 1 Hurst air bag control center, yellow case
____ 1 Black bag, containing:
____ 1 Yellow air bag fill hose
____ 1 Blue air bag fill hose
____ 1 Red air bag fill hose
____ 1 HK - 9 ton air bag
____ 1 HK - 21 ton air bag
____ 1 HK - 26 ton air bag
____ 5 airbag cribbing boards
Form 23.5.5
Page 4
Darien Fire Department
Squad 2360 Monthly Inspection Log
Last Revised 03/12/2009 Form 23.5.5
Bottom shelf
____ Cribbing
____ 2 Step chocks
____ 4 X 4’s
____ Wedges
Compartment # 10
____ 2 Electric negative pressure fan
____ 1 Quick grip bar
____ 1 Gas PPV fan
____ Engine oil level - 10w30 oil
____ Run fan for minimum of 1 minute
____ Fill fuel level to full (use gasoline found in comp. #2)
Interior crew compartment
____ 4 Orange Fire Vulcan flashlights on charger
____ 17 Traffic cones
____ 5 Rotary saw blades
Broom compartment
____ 3 Broom handles
____ 3 Broom heads
Cabinet #1
____ 4 boxes barricade tape
____ 2 MSDS books
____ 2 Phone books
SCBA rack
____ 4 Scott SCBA racks w/ bottles
____ SCBA tank full
____ Little ED angle head flashlight on left shoulder strap
Cabinet #2
Top Shelf
____ 4 Stop / Slow paddle signs
____ 2 Extrication blankets
Bottom shelf
____ 1 Sawzall in case w/ charger
____ batteries fully charged
____ 8 LED Turbo Flares in case w/ screwdriver
Form 23.5.5
Page 5
Darien Fire Department
Squad 2360 Monthly Inspection Log
Last Revised 03/12/2009 Form 23.5.5
Cabinet #3
Middle shelf
____ 1 12v charger cord for TIC
____ 1 Hood for TIC
Bottom shelf
____ 1 Thermal Imaging Camera on charger
SCBA tank rack
____ 4 Scott SCBA racks w/ bottles
____ SCBA tank full
____ Little ED angle head flashlight on left shoulder strap
Cabinet #4
Top shelf
____ 1 Haz Mat gear bag, blue
____ 4 Hard hats
____ 2 Coveralls, brown
____ 4 Tyvek suits, white
____ 4 Gloves, black
____ 4 Boots, yellow
____ 1 Yellow Chem tape
____ 3 Full face respirators in bag, black
____ 1 Face piece
____ 2 Large air purifying filters
____ 1 Small air purifying filter
Middle shelf
____ 1 SCBA mask wipes, box
____ 1 First aid kit
Bottom shelf
____ Misc bottled water or Gatorade
Command desk
____ 1 Cell phone w/ charger
____ 1 MABAS portable radio
____ 2 UHF portable radio
____ 1 Operations orange book
____ 1 Clipboard w/ run reports and pens
Signature:
Date:
Form 23.5.5
Page 6
Darien Fire Department
Squad 2360 Monthly Inspection Log
Last Revised 03/12/2009 Form 23.5.5
Form 23.5.5
Page 7