Airhead Operations, Where AMC Delivers: The Linchpin Of Rapid ...
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK
Document Outline
- Contents
- Disclaimer
- Foreword
- About the Author
- Acknowledgment
- Introduction
- Chapter 1 Air Mobility in a New Era
- Chapter 2 The Air Mobility Command Structure within the Theater
- Air Mobility Element
- Tanker Airlift Control Element
- Combat Control Team
- Aeromedical Evacuation
- Conclusion
- Notes
- Chapter 3 Operation Restore Hope (Somalia): A Case Study for Airhead Operations
- The Background
- Initial Operations: Provide Relief
- The Crisis Action Process
- Restore Hope: Operations in the Theater
- The Deployment of Forces
- Mogadishu Airhead Operations
- Airhead Operations outside Mogadishu
- The Air Mobility Element
- Intratheater Airlift
- Runway Deterioration
- Flow Control
- Mission Accomplishment
- Notes
- Chapter 4 Restore Hope: Lessons Learned
- Operational Problems
- Command and Control
- Management of Airfield Real Estate
- Flow Control
- Communications
- Ground Security Integration
- Sustainment and Support
- Sustainment
- Logistical Support
- Shelters
- Notes
- 5 WHERE ARE WE GOING FROM HERE?
- The C-17 Globemaster III
- The C-17 at the Airfield
- Throughput
- Materials Handling Equipment
- The KC-10 Self-Contained Loading Platform
- In-Transit Visibility
- The Remote Consolidated Aerial Port System
- Global Reach Laydown
- Air Mobility Operations Groups
- Conclusions and Recommendations
- Notes
- BIBLIOGRAPHY
- INDEX
- Illustrations
- 1 The Deliberate Planning Process
- 2 Crisis Action Planning Process
- 3 UTC 7E lABO Mob C2 Element, TALCE MOG 6 or Less
- 4 UTC 7E IAGO Mob C2 Air Rep Comm (MARC)
- 5A Belet Uen Airfield, Somalia (Landing Zone Survey)
- 5B Belet Uen Airfield, Somalia
- 6A Baidoa Airfield, Somalia (Landing Zone Survey)
- 6B Baidoa Airfield, Somalia
- 7A Mogadishu Airport, Somalia (Landing Zone Survey)
- 7B Mogadishu Airport, Somalia
- 8 Theater Areas of Responsibility
- 9 Operation Restore Hope
- 10A Bale Dogle Airfield, Somalia (Landing Zone Survey)
- 10B Bale Dogle Airfield, Somalia
- 11A Kismayu Airfield, Somalia
- 11B Kismayu, Somalia (Landing Zone Survey)
- 12 Restore Hope : End of Phase 1, 16 December 1992
- 13 Restore Hope AFFOR Organization
- 14 Mogadishu Embassy Organization
- 15 Mogadishu Airport Organization
- 16 Lift Requirements Process (JMCC)
- 17 Intratheater Airlift: A STAR Schedule
- 18 Air Traffic at Mogadishu Airport
- 19 Passengers Moved Intertheater-Per Day
- 20 Intertheater Airlift-Tons Per Day
- 21 Restore Hope: End of Phase II, 28 December 1992
- 22 Supply Classes
- 23 Free World Runway Distribution (without the United States)
- 24 C-5 Turning Radius and Ground Clearance
- 25A C-17 Turnaround
- 25B C-17 Turning Radius and Ground Clearance
- 26A USAF/McDonnell Douglas C-17A
- 26B C-17 General Aircraft Dimensions
- 26C C-17: Small on the Outside
- 27 Throughput The Key to Operational Capability