10 Steps To Developing A Wind Farm

10 Steps to Developing a Wind Farm


This information is intended for

1. Understand Your Wind Resource. The most important factor to consider
in the construction of a wind energy facility is the site's wind resource. A site
landowners interested in

must have a minimum annual average wind speed in the neighborhood of 11-
developing or hosting a wind

13 mph to be considered. Local weather data available from airports and
farm on their property. It briefly

meteorological stations may provide some insight as to averages. You can
addresses key factors in this
also check the wind maps for your state on the National Renewable Energy

decision:
Laboratory Web site. Eventually, you will want to install your own monitoring


devices to record the site's wind characteristics. A listing of consultants
Understanding your wind
specializing in wind resource assessment can be found at the American Wind

resource
Energy Association Web site: http://www.awea.org/directory/consultcde.html.


More information on basic principles of wind resource evaluation can be found
Distance from existing

at http://www.awea.org/faq/wwt_basics.html.
transmission lines




Securing access to land
2. How Far Is Your Site from Existing Transmission Lines? A critical issue


in keeping costs down in building a wind farm is minimizing the amount of
Establishing access to capital

transmission infrastructure that has to be installed. High-voltage lines can cost


thousands of dollars per mile. Whenever possible, availability and access to
Identifying reliable power


existing lines should be considered in selecting a site.
purchaser or market


3. Secure Access to Land. Landowners, both private and public, will expect
Addressing siting and project
to be compensated for any wind energy development that occurs on their land.
feasibility considerations
Royalty or lease agreements will need to be discussed with all parties involved.

Roads, transmission equipment, maintenance infrastructure, turbines, etc. all
Understanding wind energy’s
need to be considered. Moreover, the construction of a wind farm requires the
economics
use of heavy industrial equipment so developers will need to ensure there are

roads capable of handling significant weight. The planning phase requires
Obtaining zoning and permitting
cooperation of landowners and the local community.
expertise


4. Establish Access To Capital. Building a wind farm is not cheap. Wind
Establishing dialogue with
power development can cost around $2 million per megawatt (MW) of
turbine manufacturers and
generating capacity installed. To take advantage of economies of scale, wind
project developers
power facilities should be in excess of 20 MW. Assuming the average wind

turbine is rated at 1.5 megawatts (MW) in capacity, this means the installation
Securing agreement to meet O&M
needs
of at least 13 turbines and an initial investment of about $40 million.


5. Identify Reliable Power Purchaser or Market. Today, wind energy is one
the most cost-effective renewable energy options on the market. In fact, the
cost of electricity from a new wind project is now in a range that is competitive
FOR MORE INFORMATION, PLEASE
CONTACT:
with the cost of electricity from new power plants of any kind. However, utilities

will tend to purchase power from what they consider to be the cheapest and
American Wind Energy Association
most reliable technology. There is a fast-growing demand for wind power as
1501 M Street, NW
well. Demand for “green power” (electricity from clean sources like wind that is
Suite 1000
sold to customers at a premium price) and environmental requirements are
Washington, DC 20005

also creating buyers for wind energy at competitive rates. A developer should
(202) 383-2500
typically secure a commitment from one or more buyers for the plant’s output
windmail@awea.org
over 10-30 years of its operational lifetime.



Updated 3-2009

Continued…
10 Steps to Developing a Wind Farm




6. Address Siting and Project Feasibility Considerations. The fact that a site is windy does not always mean it

is suitable for wind power development. A developer needs to consider many factors in siting a project. Are there
enda

ngered or protected species that could be jeopardized by the presence of the facility? Is the site's geology

suitable and appropriate for industrial development? Will turbine sound and aesthetics be issues for the local

community? Will the turbines obstruct the flight path of local air traffic? There are quite a few environmental and

social issues that will need to be addressed in the siting of a wind power facility. Wind farms can make great
neighb ors, but it is the obligation of the developer to work to ensure that a project proceeds in a fashion that is

acceptable to regulators and the local community. AWEA has developed a Siting Handbook that can be a useful

tool in addressing siting considerations. The Handbook is available online at

http://www.awea.org/sitinghandbook/.


7. Understand Wind Energy's Economics. There are many factors contributing to the cost and productivity of a

wind plant. For instance, the power a wind turbine can generate is a function of the cube of the average wind

speed at its site, which means that small differences in wind speed mean large differences in productivity and

electricity cost. Additionally, the swept area of a turbine rotor is a function of the square of the blade length (the

radius of the rotor’s swept area). A modest increase in blade length boosts energy capture and cost-

effectiveness. Financing methods can make a major difference in project economics as well. Securing significant

investment capital or joint ownership of a project can cut costs significantly. Furthermore, there are federal and

state incentives for which a project may qualify and which could reduce costs and encourage more favorable

investment. For an online database of state and federal renewable energy incentives, go to

http://www.dsireusa.org/.



8. Obtain Zoning and Permitting Expertise. Siting any power project can be a daunting task due to the complex
arra

y of social and environmental factors at play. A wind power developer would be well served to obtain the

services of a professional familiar with the regulatory environment surrounding wind power development. A listing

of consultants is available at http://www.awea.org/membercenter/memberdirectory.aspx.



9. Establish Dialogue With Turbine Manufacturers and Project Developers. Every wind turbine is different

despite seemingly similar power ratings. Some machines are designed to operate more efficiently at lower wind

speeds, while others are intended for more robust wind regimes. A prospective wind power developer would be

wise to investigate all of the various considerations and compare the projected performance to existing machines.
Moreo
ver, anecdotal information and even the professional services of wind power developers may prove helpful.

A listing of utility-scale wind turbine manufacturers can be found at http://www.awea.org/directory/wtgmfgr.html
and a listing of developers can be found at http://www.awea.org/membercenter/memberdirectory.aspx.

Continued…


10. Secure Agreement to Meet O&M Needs. Wind turbine technology has made great strides in the recent

years. Today's machines are more efficient and cost-effective than ever. However, they are also more complex.

Turbine availability (reliability) is a major factor in project success, and the services of professional familiar with

the O&M (operation and maintenance) of wind turbines can prove to be invaluable. Also, turbine manufacturers

may offer more favorable product guarantees knowing that qualified project operators will be on site to maintain

the equi
Wind Energy and Wildlife
pment. A listing of project operators can be found at

http://www.awea.org/membercenter/memberdirectory.aspx .




Upda
Up
t
da ed
e 3
d -
3 20
-
09
20

09